drek231 [11]
2 years ago
15

There are four activities on the critical path, and they have standard deviations of 1, 2, 4, and 2. what is the probability tha

t the project will be completed in 38 weeks if its expected completion time is 40 weeks?
Mathematics
1 answer:
Sauron [17]2 years ago
7 0
The expected completion time is μ = 40 weeks.
The random variable, X = 38 weeks (the probable time)

If the standard deviation is σ, then the z-score is z = (x - μ)/σ.

Let us test the given standard deviations.
When σ=1,
z = (38-40)/1 = -2
From standard tables,
P(x<=38) = P(z<=-2) = 0.0228 =2.3%

When σ=2,
z = (38*40)/2 = -1
P(x<=38) = P(z<=-1) = 0.1587 = 15.9%

When σ=4,
z = (38-40)/4 = -0.5
P(x<=38) = P(z<=-0.5) = 0.3085 = 30.9%

Answers:
z=1 => 2.3%
z=2 => 16% (approx)
z=4 => 31% (approx)

You might be interested in
10. If PQRS is a parallelogram, then P - R is:<br>(a) 20<br>(b) 30<br>(c) 90<br>(d) 0​
statuscvo [17]

Answer:

d) 0

Step-by-step explanation:

P -R = 0

Because in parallelogram, opposite angles are equal.

4 0
2 years ago
The volume of a prism is the product of its height and area of its base, V = Bh. A rectangular prism has a volume of 16y4 + 16y3
Komok [63]
base 16y^2
height y^2 + y + 3
V = b*h
V = 16y^2(y^2 + y + 3)
V = 16y^4 + 16y^3 + 48y^2
Last option
6 0
2 years ago
Read 2 more answers
Which graph shows a dilation? On a coordinate plane, 2 triangles are shown. The smaller triangle has points (negative 2, 0), (ne
allochka39001 [22]

Answer:

its D

Step-by-step explanation:

5 0
2 years ago
Read 2 more answers
Which equation shows the point-slope form of the line that passes through (3, 2) and has a slope of y plus StartFraction one-hal
vesna_86 [32]

Answer:

B. y - 2 = 1/3(x - 3)

4 0
2 years ago
Read 2 more answers
£399 is shared between Ann, Bill, Chloe and Dave.
tiny-mole [99]
Answer is 4.5 Show all
Steps below
6 0
2 years ago
Other questions:
  • A mountaineer climbed 1,000 feet at a rate of x feet per hour. He climbed an additional 5,000 feet at a different rate. This rat
    9·1 answer
  • Clay is playing darts. his dartboard contains ten equal-sized zones with point values from 1 to 10. write code that simulates hi
    7·2 answers
  • PLEASE!IT'S URGENT!!! Richard wants to install a paver patio in the shape shown. The dotted line represents a line of symmetry.
    14·2 answers
  • The price of a box of 15 cloud markers is $12.70. The price of a box of 42 cloud markers is $31.60. All prices are without tax,
    5·2 answers
  • The graphs below have the same shape. What is the equation of the blue graph?
    5·2 answers
  • Which of these equations have no solution? Check all that apply. 2(x + 2) + 2 = 2(x + 3) + 1 2x + 3(x + 5) = 5(x – 3) 4(x + 3) =
    5·2 answers
  • 1. Three friends pooled their money to purchase a new game system that costs $298. One person
    13·1 answer
  • A traffic engineer is counting the number of vehicles by type that turn into a residential area. The table below shows the resul
    5·1 answer
  • I would like to purchase 20 products at a cost of $65 per product. What would be my total with 3.5 sales tax
    13·1 answer
  • The table below gives the cost per person to rent a fishing charter boat. Find the rate of change given that it is constant. Als
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!