The argument for the function would be answer "D".
Answer:
PLCs (Programmable logic controller) were original designed as replacement for relay control panels. Relay is another word for a switch. Relay control panels were made for the control of electronic instrumentents or devices. Later on PLCs were made to replace these timers and relay control panels. PLCs are more reliable, flexible and can work better in the harsh environmental situations then the relay control panels.
Answer:
Continuous Integration
Explanation:
In continuous integration process, A program or piece of code is edited, tested and validated by team of software developers or contributors to complete and deploy the single project. This practice will improve the quality and reliability of the code.
Improvement, delivery and deployment are the three different phases, to complete the process of continuous integration.The individuals who contribute in a code or program in terms of improvement, delivery and deployment make a team that leads to continuous integration.
So, Agile team Continuously adapt Continuous Integration to new circumstances and enhance the methods of value delivery.
Answer:
def sum_1k(M):
s = 0
for k in range(1, M+1):
s = s + 1.0/k
return s
def test_sum_1k():
expected_value = 1.0+1.0/2+1.0/3
computed_value = sum_1k(3)
if expected_value == computed_value:
print("Test is successful")
else:
print("Test is NOT successful")
test_sum_1k()
Explanation:
It seems the hidden part is a summation (sigma) notation that goes from 1 to M with 1/k.
- Inside the <em>sum_1k(M)</em>, iterate from 1 to M and calculate-return the sum of the expression.
- Inside the <em>test_sum_1k(),</em> calculate the <em>expected_value,</em> refers to the value that is calculated by hand and <em>computed_value,</em> refers to the value that is the result of the <em>sum_1k(3). </em>Then, compare the values and print the appropriate message
- Call the <em>test_sum_1k()</em> to see the result