Answer:
The correct answer is option d.
Explanation:
Unfavorable weather in Florida has adversely affected the production of Florida oranges. The decline in production has led to reduced supply of Florida oranges. This decrease in supply will lead to an increase in the price.
As Florida oranges and California oranges are substitutes, with the increase in the price of Florida oranges will lead to an increase in the demand for California oranges as people will prefer the cheaper substitute.
Answer:
$936.17
Explanation:
The current market price of the bond = present value of all coupon received + present value of face value on maturity date
The discount rate in all calculation is YTM (6.12%), and its semiannual rate is 3.06%
Coupon to received semiannual = 5.3%/2*$1000= $26.5
We can either calculate PV manually or use formula PV in excel to calculate present value:
<u>Manually:</u>
PV of all coupon received semiannual = 26.5/(1+3.06)^1 + 26.5/(1+3.06)^2....+ 26.5/(1+3.06)^24 = $445.9
PV of of face value on maturity date = 1000/(1+6.12%)^12 = $490.27
<u>In excel:</u>
PV of all coupon received semiannual = PV(3.06%,24,-$26.5) = $445.9
PV of of face value on maturity date = PV(6.12%,12,-$1000) = 1000/(1+6.12%)^12 = $490.27
The current market price of the bond = $445.9 + $490.27 = $936.17
Please excel calculation attached
<span>The survey and subsequent information this research would glean is called primary data. Primary data are different information and facts which are needed for a research and the data came from first-hand contributor or experiences. The primary data can be from interviews.</span>
Total manufacturing costs=direct material+direct labor+manufacturing overhead
Calculate direct labor
Let direct labor be x
120%=1.2
1.2x=180000
Divide both sides by 1.2
X=180,000÷1.2
X=150,000 direct labor
Total manufacturing costs=
120,000+150,000+180,000
=450,000...answer
Hope it helps!
<span>If a contractor is planning to build a new apartment complex in the Unites States, then he will have to abide by a few laws in order to avoid violation charges.
However, the US Attorney General does not have the jurisdiction to issue fines even if many laws have been violated by the contractor.
The contractor should supposedly follow all the laws especially the ADA law (Americans with Disabilities Act).
</span>