<span>20.28% is the answer</span>
The
<u>correct answer</u> is:
Matthew's rate is higher by $50 per month.
Explanation:
We know that Christopher's rate is $550 per month.
To find Matthew's rate, we will treat the data we have as ordered pairs:
(3, 1800)
(6, 3600)
(9, 5400)
We find the slope of the line between these points. The formula for slope is:

Using the first two points, we have:

To verify Matthew saves the same amount each month, we will find the slope between the second two points and make sure they're the same:

Matthew's rate is $600 per month.
This is higher than Christopher's by 600-550=$50 per month.
Answer:
The middle slab is 2 cubic feet.
Step-by-step explanation:
The problem presents the information: Mr. Alvarez makes a walkway out of 3 cement slabs.
However, he uses 14 Cubic feet of cement to make the walkway. Each square slab has a volume of 4 cubic feet.
Mr. Alvarez makes the way with 3 cement slabs (NC), each cement slab is 4 cubic feet (UC). It means, the cubic feet for the 3 cement slabs (CS) are:
CS = NC* UC = 3*4 = 12 cubic feet.
It means Mr. Alvarez uses 12 cubic feet with 3 cement slabs.
Mr. Alvarez used in total of 14 cubic feet of cement (TC). At this moment he used 12 cubic feet of cement (CS). It means, there will be a part of the cement slab used (PC).
PC = TC - CS = 14 - 12 = 2 Cubic feet.
Finally, the middle slab is 2 cubic feet of cement.
Answer: 2185
Step-by-step explanation:
Let p be the proportion of visitors are campers.
Given : The Tennessee Tourism Institute (TTI) plans to sample information center visitors entering the state to learn the fraction of visitors who plan to camp in the state.
The prior proportion of visitors are campers : p=0.35
Allowable error : E= 2%= 0.02
We know that the z-value for 95% confidence = 
Then by Central Limit Theorem , the required sample size would be :


Simply , we get
[Rounded to the next whole number.]
Hence, the smallest sample size to estimate the population proportion of campers =2185
We use the z statistic:
z = (x – u) / s
But first let us calculate the standard deviation s,
sample x and mean u.
s = sqrt (n p q)
s = sqrt (112 * 0.77 * (1 – 0.77))
s = 4.45
x = 0.81 * 112 = 90.72
u = 0.77 * 112 = 86.24
So the z score is:
z = (90.72 – 86.24) / 4.45
z = 1.00
From the standard tables, the P value at z = 1.00 using
right tailed test is:
<span>P = 0.1587 = 15.87%</span>