Answer:
Start the algorithm and check the weight of the ship. Load the crystalline to the ship. Check to see if the ship weighs ship weight + k pound crystalline, if less, add more crystalline. If excess, remove the excess crystalline, but if the weight meets the condition, then take off with the loaded ship to planet sigma.
Explanation:
The algorithm continuously checks the weight of the ship on loading with the calculated sum of the ship and k pound crystalline weight. The ship is able to load the correct maximum amount of crystalline to the planet sigma.
Answer:
Kanban System
Explanation:
Kanban can be regarded as one of Lean tools which is been designed to carry out reduction of the idle time in a production process. The idea or concept behind this Kanban system, is to make delivery of needs of the process needs at exactly the it needs it. Kanban can be reffered to as visual cards. Kanban can as well be explained as scheduling system that is used for lean manufacturing as well as just-in-time manufacturing. Taiichi Ohno, who was an industrial engineer at Toyota carried out development of kanban so that there could be an improved manufacturing efficiency. Kanban is considered as one method used to achieve JIT.
It should be noted that Kanban System is One tool of Lean that is a container, card, or visual limit that signals when work needs to be done or replenishment needs to be initiated .
Since Greg wants to become an advertising and promotions manager, he needs to at least gain a (B) bachelor’s degree level of education, since generally, this educational background is expected from individuals who wishes to work in an entry-level position in the field of advertising.
One of the skills that he also needs to develop is (C) communication skills, because he would have to be able to communicate in both written and spoken to develop the advertisements according to the client’s desires.