Answer:
build and equip a production facility in Europe-Africa and then expand it as may be needed to supply all (or at least most) of the pairs the company intends to try to sell in Europe- Africa
Explanation:
In order to have effective competition and profitable for the long term approach for decreasing or removing the effect of tariff that would be paid on pairs is that to establish the production facility so that it would get expanded and the same is to be sell in Europe-Africa
Therefore the above represents the answer
Answer:
b. Job order production.
Explanation:
Job order production is the process of manufacturing non-standard or unique products for specific customers. Sometimes making a job order production is also called making a work order or making it an individual order, because each order or work is an order placed by the customer. In most cases, custom jobs are created only once. Many manufacturers specialize in mass production of custom products. Buyers come to the manufacturer with a special design or product, and the manufacturer develops and creates an individual product.
A customer-oriented production puts customer satisfaction at the center of each of its business decisions. Customer focus is defined as an approach to sales and customer relations, in which employees focus on helping customers meet their long-term needs and desires. Here, management and employees coordinate their individual and team goals in order to satisfy and retain customers. This contrasts, in particular, with a focus on sales, which is a strategic approach when the needs and desires of a company or seller are evaluated in relation to the client.
Just in Time production is an inventory strategy developed to increase production and productivity. All production processes (in-progress cost) and the type of production taking into consideration the time criteria in order to minimize the associated sub-costs are derived from the Japanese Kanban system. During production, it determines the order of work by considering the production of the next process. This strategy, which states that the order level is reached in the storage process and that the order must be met after this point, provides the most efficient storage volume and production continuity. In short, just in time, the demand is to produce as soon as possible with excellent quality and transport it to the right place at any time.
Job lot production is a production futures contract whose trading volume is below the level required by normal operations. These contracts or lots are available to add liquidity to futures exchanges by allowing smaller "participants" to enter the market.
Process production is a system from production in which a product goes through several processes or stages from production, which will be operated on a more continuous basis; for example, in oil refineries and petrochemical plants, where these processes include liquid or semi-solid materials. In the production of the main product, they say, gasoline, from such in the production process, by-products such as tar or creosote can inevitably arise.
Answer:
8.5
Faster than Normal
Explanation:
Charlene Brewster normal time for the operation will be calculated by taking average of times.
( 8.4 + 8.6 + 8.3 + 8.5 + 8.7 + 8.5 ) / 6
= 8.5
The normal time will be calculate by dividing the Charlene Brewster time by performance rating
8.5 / 110% = 7.7
The Charlene work performance is rated as faster than the normal time.
Answer:
$225,000
Explanation:
Data provided in the question:
Note payable = 10%, $3,000,000
Payment amount = $1,000,000
Now,
Since the first payment is made in the month of October
Therefore,
Duration from October 2018 to October 2019 = 9 months =
years
Therefore,
Interest payable for 2019 will be = $3,000,000 × 0.10 ×
= $225,000
Answer: When computing the cost per equivalent unit, the weighted-average method of process costing considers: C) costs incurred during the current period plus cost of beginning work in process inventory.
Explanation: This is because the weighted-average method takes into account the costs of the previous period and the costs of the current period.