Answer:
0.84 square in
Step-by-step explanation:
Since the capacity of the cable is proportional to its cross-sectional area. If a cable that is 0.3 sq in can hold 2500 lb then per square inch it can hold
2500 / 0.3 = 8333.33 lb/in
To old 7000 lb it the cross-sectional area would need to be
7000 / 8333.33 = 0.84 square in
Answer:
Step-by-step explanation:
Area of trapezium = 1/2 × h (a+b) = 864 cm^2
where h is the height and a and b are the two parallel sides
h = 24 cm
a = 30 cm
b = ?
1/2 × 24 ( 30 + b ) = 864
12 ( 30 + b ) = 864
30 + b = 864/12
30 + b = 72
b = 72 - 30
b = 42
Therefore the lenght of other base = 42 cm
Plz mark it as brainliest !!!!!!!!!!
Given:
House valued at $ 425,000
AAA Insurance: $0.38 per 100 with a $500 deductible
425,000 / 100 = 4,250
4,250 x 0.38 = 1,615 annual premium
Thompson’s insurance: $0.26 per 100 with a $1000 deductible
425,000 / 100 = 4,250
4,250 x 0.26 = 1,105 annual premium
If
an incident occurs that results to damage or loss to their home, the
couple shall shell out 500 before AA Insurance can take over payment for
expenses. On the other hand, the couple will shoulder 1,000 before
Thompson’s insurance take over payment for expenses in the event there
is an incident that results to damage or loss to their home.
c.
Thompson’s Insurance is cheaper even if Tara and Levi experience an
incident that results in severe damage or loss to their home.
Answer:
The middle slab is 2 cubic feet.
Step-by-step explanation:
The problem presents the information: Mr. Alvarez makes a walkway out of 3 cement slabs.
However, he uses 14 Cubic feet of cement to make the walkway. Each square slab has a volume of 4 cubic feet.
Mr. Alvarez makes the way with 3 cement slabs (NC), each cement slab is 4 cubic feet (UC). It means, the cubic feet for the 3 cement slabs (CS) are:
CS = NC* UC = 3*4 = 12 cubic feet.
It means Mr. Alvarez uses 12 cubic feet with 3 cement slabs.
Mr. Alvarez used in total of 14 cubic feet of cement (TC). At this moment he used 12 cubic feet of cement (CS). It means, there will be a part of the cement slab used (PC).
PC = TC - CS = 14 - 12 = 2 Cubic feet.
Finally, the middle slab is 2 cubic feet of cement.
Answer:
(2,2)
Step-by-step explanation: