The total amount of cable used is 47.4m
<u>Explanation:</u>
Given:
Amounts of cable used that has to be rounded off to 1 decimal place:
12.995 m ≈ 13.0 m
7.505 m ≈ 7.5m
10.08 m ≈ 10.1 m
6.95 m ≈ 7.0 m
9.75 m ≈ 9.8 m
Total amount of cable used = 13m + 7.5m + 10.1m + 7m + 9.8m
= 47.4m
Therefore, total amount of cable used is 47.4m
Answer:
Follows are the solution to this question:
Step-by-step explanation:
Following are the step which is used in the question:
- Step 1, In this use the sheet on the formulas tab we use the function, that is the part of the FLG "Function Library group".
- Step 2, In this step, click the Financial button, and after that click on the PMT.
- Step 3, after clicking on PMT apply or Enter the value that is "B3/12", in this it provides the rate argument box.
- Step 4, after insert value in B4, it provides the Naper argument box, that input the value in "B2" cell into the Pv argument box.
- Step 5, After click the OK button.
The quantities in the proportion you give add to 16 pounds, of which 2 pounds are cement. That is, cement constitutes 1/8 of the total weight.
For each yard of concrete, 4000 lb/8 = 500 lb of cement are used.
For 12.5 yards of concrete, 12.5 * 500 = 6,250 pounds of cement will be used.
_____
"yard" in this case is shorthand for "cubic yard".
Answer:
amount of pepper required= 7.5 tsp
amount of garlic powder required = 30 tsp
Step-by-step explanation:
Given,
amount of salt used for small batch of the recipe = 2 tsp
amount of pepper used for small batch of the recipe = 1 tsp
amount of garlic powder used for small batch of the recipe = 4 tsp
amount of salt used for the larger batch = 15 tsp
= 2 x 7.5 tsp
= amount of salt used for small batch the recipe x 7.5
So,
the amount of pepper needed for the larger batch= 7.5 x amount of pepper used for the small batch of recipe
= 7.5 x 1 tsp
= 7.5 tsp
the amount of garlic powder needed for the larger batch= 7.5 x amount of garlic powder used for the small batch of recipe
= 7.5 x 4 tsp
= 30 tsp