Answer:
CPI = 0.94
Explanation:
The formula for execution time is given below:
Execution time = clock cycles * cycle time
As Execution time = 750 s
clock cycle time = 0.333 ns = 0.333 * 10^-9
so putting these values in the above formula, we get
750 = clock cycles * ( 0.333 * 10^-9 )
clock cycles = 750 / ( 0.333 * 10^-9 )
clock cycles = 2.25 * 10^12
As the results of the spec cpu2006 bzip2 benchmark running on an amd barcelona has an instruction count = 2.389 * 10^12
and the formula for clock cycles is:
clock cycles = number of instructions * CPI
CPI = clock cycles / number of instructions
CPI = 2.25 * 10^12 / 2.389 * 10^12
CPI = 0.94
Answer:
Slide transition.
Explanation:
PowerPoint application can be defined as a software application or program designed and developed by Microsoft, to avail users the ability to create various slides containing textual and multimedia informations that can be used during a presentation.
Some of the features available on Microsoft PowerPoint are narrations, transition effects, custom slideshows, animation effects, formatting options etc.
Basically, the views that are available on the Microsoft PowerPoint application includes;
1. Slide Sorter.
2. Notes Page.
3. Reading Pane.
4. Presenter view.
In this scenario, Ryan has made a presentation of ten slides, which he wants to display in sequence after a specific time interval.
Using slide transition in the presentation software, Ryan can make the slides appear, one after the other, after a specific time interval.
Slide transition is an inbuilt feature of a presentation software that automatically changes the slides at regular intervals.
This is the recorded history of the development of a group functioning within an organization. Identify the sentence that refers to the norming stage of group development.
. The group then created a working structure that everyone agreed with.
Yes in my opinion. People will say no but there is no right answer