answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Andrej [43]
2 years ago
8

There are three parts to number and there is a number 2. Complete all

Business
1 answer:
Ronch [10]2 years ago
3 0

Answer:

  • <u>a. 2/9</u>
  • <u>b. 11/18</u>
  • <u>c. 5/6</u>
  • <u>d. 13/18</u>

<u></u>

Explanation:

The question is incomplete. It is missing the probability table.

A similar question in the internet has this table

Number of Homework Assignments Completed    0       1        2      3

Probability                                                                  1/6   2/9   5/18   1/3

Also the question #2 is incomplete. You can complete it with: "Find the probability that the number of homework assignments Daisha​ completes is not exactly 2"

<h2>Solution</h2>

<u><em>a. Probability that Daisha completes: Exactly one assignment</em></u>

For this you must understant what a the table represents. It is a table of a discrete random variable. The random variable is the number of homework assignments completed. The probability table gives the probability for each one of the possible values of the random variable.

This is, you have:

  • P(X=0) = 1/6
  • P(X=1) = 2/9
  • P(X=2) = 5/18
  • P(X=3) = 1/3

That lists all the possible values of the random variable each with its corresponding probability. Thus, those probabilities must add up 1. Check it:

      \dfrac{1}{6}+\dfrac{2}{9}+\dfrac{5}{18}+\dfrac{1}{3}=\dfrac{3+4+5+6}{18}=\dfrac{18}{18}=1\checkmark

Note that the events are all mutually exclusive of the others:  every probability is the probability that the random variable takes exactly that value. I mean, 1/6 is the probability of completing exactly none homework assignment, 2/9 is the probability of completing exactly one homework assigment, and so on.

Then, the asnwer to the first question, is that the probability that Daisha completes: exactly one assignment is 2/9.

<u><em>b. Probability that Daisha completes: More than one assignment</em></u>

The probability that Daisha completes more than one assignment is the probability that she completes 2 or 3 assignments.

Using the corresponding notation for discrete random variables, and the fact that they are mutually exclusive events, that is:

  • P(X > 1) = P(X = 2) + P(X = 3)

From the table:

  • P(X = 2) = 5/18
  • P(X = 3) = 1/3

        P(X>1)=\dfrac{5}{18}+\dfrac{1}{3}=\dfrac{5+6}{18}=\dfrac{11}{18}

Thus the answer is 11/18

<u><em>c. Probability that Daisha completes: At least one assignment</em></u>

The probability that Daisha completes at least one assignment is the complete to that she completes none assignment, this is:

  • P(X ≥  1)  = 1 - P(X = 0)

      P(X\geq 1)=1-P(X=0)=1-\dfrac{1}{6}=\dfrac{5}{6}

Note that that is the same as:

          P(X\geq 1)=P(X=1)+P(X=2)+P(X=3)=\\\\\\=\dfrac{2}{9}+\dfrac{5}{18}+\dfrac{1}{3}=\dfrac{4+5+6}{18}=\dfrac{15}{18}=\dfrac{5}{6}

<u><em>2. Find the probability that the number of homework assignments Daisha​ completes is not exactly 2.</em></u>

The probability that the number of assignments Daisha completes is not exactly 2, is that it is 0, 1, or 3.

Mathematically:

        P(X\neq2)=1-P(X=2)\\\\\\P(X\neq2)=1-\dfrac{5}{18}=\dfrac{18-5}{18}=\dfrac{13}{18}

You can verify that that is the same as: P(X=0) + P(X=1) + P(X=3).

Therefore, the answer is 13/18

You might be interested in
At the end of 2017​, Apple had cash and​ short-term investments of $ 74.48 ​billion, accounts receivable of $ 17.58 ​billion, cu
yarga [219]

Answer:

a. Apple current ratio =  Current asset / Current liabilities

                                    =   $128.78billion/ $101.27billion

                                     = 1.27

b Apple Quick ratio    =  (Current asset - Inventory ) / Current liabilities

                                     = ( $74.48billion + $17.58billion)/ $101.27billion

                                     =  $92.06billion/$101.27billion

                                     =  0.91

c. Apple Cash ratio   = cash and short-term investment / current liabilities

                                   =  $74.48billion / $101.27billion

                                  =   0.77

d. By comparing the computed ratios of Apple and HPQ, it shows that Apple asset liquidity is better than that of HPQ.  The current ratio of Apple is 1.27 as against 0.96 for HPQ. also in term of Quick ratio, Apple has 0.91 while HPQ has 0.54.  The cash ratio of HPQ is 0.33 while Apple figure stood at 0.77

Explanation:

5 0
2 years ago
The Heinlein and Krampf Brokerage firm has just been instructed by one of its clients to invest $250,000 of her money obtained r
AVprozaik [17]

Answer: provided in the explanation segment

Explanation:

step by step process followed according.

The following is assumed as the decision variables:

a = Value of Dollars invested in Municipal Bonds

b = Value of Dollars invested in Thompson Electronic Inc

c = Value of Dollars invested in United Aerospace Corp

d = Value of Dollars invested in Palmer Drugs

e = Value of Dollars invested in Happy Days Nursing Home

Objective or Goal Function:

Maximize M = 5.3 a + 6.8 b + 4.9 c + 8.4 d + 11.8 e

Subjected to the conditions or constraints:

Constraint 1: Amount came from selling land in Ohio

a + b + c + d + e <= 250000

Constraint 2: Municipal bonds must be at least 20% of the total investments, hence

a >= 0.2 (a+b+c+d+e)

Constraint 3: Electronic + Drug + Aero Space must be at least 40 % of the total funds, hence

b + c + d >= 0.4 (a + b + c + d + e)

Constrain 4: e <= 0.5 a

All these decision variables must be non negative. That is:

a >= 0, b >= 0,c >= 0, d >= 0, and e >= 0

Open Excel, Click the Data menu in the main menu bar

click Solver on the top right corner just below the Data Analysis

Enter the above formulae in objective cells

Now, in the set objective box, enter the cell reference of the cell having the formula

It is asking you to set the Target cell , equal to Maxima or Minima

Once the values are formed in to an augmented matrix, can formulate it as a Linear Programming (LP) model

Tabulate those values and follow the North West corner method to climb down like a ladder

Start at the cell c11, check the neighbors c12 and c21 - if you can fit the values satisfying the constraints, fit it there - if not climb down to c22 and repeat the same for the neighbors of the new cell - viz c23 and c32 and then climb down to c33 and repeat the same untill the results is obtaine

8 0
2 years ago
Drs. Glenn Feltham and David Ambrose began operations of their physical therapy clinic, called Northland Physical Therapy, on Ja
Oliga [24]

Question attached

Answer and Explanation:

Find attached

5 0
2 years ago
Ajax, Inc., issued callable bonds with a par value of $1,000,000 that require the payment of a call premium of $10,000. The bond
IrinaVladis [17]

Answer:

The journal entry is as follows:

On September 30,

Bonds payable A/c Dr. $1,000,000

Loss on bonds retirement A/c Dr. $20,000

              To Discount on bond                        $10,000

              To cash A/c                                       $1,010,000

(To record the bonds payable and retirement)

Workings:

Loss on bonds retirement:

= (Cash + Discount on bonds) - Par value of callable bonds

= ($1,010,000 + $10,000) - $1,000,000

= $1,020,000 - $1,000,000

= $20,000

8 0
2 years ago
Greenwood Company manufactures two products—14,000 units of Product Y and 6,000 units of Product Z. The company uses a plantwide
Varvara68 [4.7K]

Answer:

Greenwood Company

1. Company's plantwide overhead rate = $57

2. Allocation of Manufacturing overhead based on plantwide overhead rate:

Product Y = $57 * 9,000 = $513,000

Product Z = $57 * 3,000 =  $171,000

3. Activity rate for the Machining activity cost pool = $20 per MHs.

4. Activity rate for the Machine Setups activity cost pool = $500 per setup.

5. Activity rate for the product Design activity cost pool = $42,000 per product.

6. Activity rate for the General Factory activity cost pool = $25

7. The batch-level activity = Machine setup

8. The product-level activity = Product Design

9. Using the ABC system, Manufacturing overhead cost assigned to Product Y = $447,000

10. Using the ABC system, Manufacturing overhead cost assigned to Product Z = $237,000

11. Using the plantwide overhead rate, the percentage of the total overhead costs allocated to product Y and Product Z is:

Product Y = 75% ($513,000/$684,000 * 100)

Product Z = 25% ($171,000/$684,000 * 100)

12. Using the ABC system, the percentage of the Machining costs assigned to Product Y and Product Z is:

Product Y = 80% ($160,000/$200,000 * 100)

Product Z = 20% ($40,000/$200,000 * 100)

13. Using the ABC system, the percentage of the Machine Setups cost assigned to Product Y and Product Z is:

Product Y = 20% ($20,000/$100,000 * 100)

Product Z = 80% ($80,000/$100,000 * 100)

14. Using the ABC system, what percentage of the product design cost assigned to Product Y and Product Z is:

Product Y = 50% ($42,000/$84,000 * 100)

Product Z = 50% ($42,000/$84,000 * 100)

15. Using the ABC system, what percentage of the General Factory cost assigned to Product Y and Product Z is:

Product Y = 75% ($225,000/$300,000 * 100)

Product Z = 25% ($75,000/$300,000 * 100)

Explanation:

a) Data and Calculations:

            Activity Cost    Activity Measure     Estimated              Expected

                  Pool                                         Overhead Cost        Activity

Machining                   Machine-hours         $200,000            10,000 MHs

Machine setups          Number of setups    $100,000             200 setups

Production design      Number of products  $84,000             2 products

General factory          Direct labor-hours    $300,000            12,000 DLHs

Total                                                              $684,000  

Activity Measure        Product Y         Product Z

Units produced               14,000            6,000

Machining                        8,000            2,000

Number of setups                40                160

Number of products               1                     1

Direct labor-hours          9,000            3,000

Plantwide overhead rate = Total overhead costs/direct labor-hours

= $684,000/12,000 = $57 per DLHs

Overhead Rate =

                                     

Machining                   $20  ($200,000/10,000) per MHs

Machine setup           $500  ($100,000/200) per setup

Production design     $42,000 ($84,000/2) per product

General factory          $25 ($300,000/12,000) per DLHs

Assignment of Manufacturing Overhead:

                                Product Y   Product Z    Total     Product Y   Product Z

Machining                $160,000   $40,000  $200,000    80%           20%

Machine setup            20,000      80,000    100,000     20%           80%

Production design      42,000      42,000      84,000     50%           50%

General factory        225,000      75,000    300,000     75%           25%

Total overhead      $447,000  $237,000  $684,000

7 0
2 years ago
Other questions:
  • When data can flow across a cable in both directions, this is known as _____ communication?
    8·1 answer
  • ONLY ANSWER IF YOU KNOW WILL MARK BRANLIEST MAX POINTS
    11·2 answers
  • Mary and David are partners who share profits and losses on a 3:1 basis. This means Mary receives 75% and David receives 25% of
    10·1 answer
  • Suppose you’ve already received your free credit reports this year. Give 3 situations in which the credit bureaus would have to
    7·1 answer
  • If a company adopts an accounts receivable factoring program, and accounts for the factoring as a sale of receivables, which of
    13·1 answer
  • Austrian Airlines was sued by a 51-year-old former director of sales who charged that he was dismissed and replaced by an employ
    10·1 answer
  • Jason is working at Sushow Motors. The position, as originally described, involved conducting research with customers. Instead,
    10·1 answer
  • The 2016 balance sheet of Whole Foods Market reports operating assets of $5,489 million, operating liabilities of $2,066 million
    15·1 answer
  • Fizzzle Inc. sold a piece of equipment during the period for $230,000 and recorded a gain of $45,000 on the sale. How should thi
    6·1 answer
  • A Production Facility has produced 515,000 products and would like to allocate these products to their customers. Given the foll
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!