Answer:
a) 0.88
b) 0.35
c) 0.0144
d) 0.2084
e) 0.7916
Step-by-step explanation:
a) The probability of a peanut being brown is 12/100 = 0.12. Hence the probability of it not being brown is 1-0.12 = 0.88
b) 12% of peanuts are brown, 23% are blue. So 35% are either blue or brown. The probability of a peanut being blue or brown is, therefore 35/100 = 0.35.
c) 12% of peanuts are red, so the probability of a peanut being red is 12/100 = 0.12. In order to calculate the probability of 2 peanuts being both red, we can assume that the proportion doesnt change dramatically after removing one peanut (because the number of peanuts is absurdly high. We can assume that we are replenishing the peanuts). To calculate the probability of 2 peanuts being both red, we need to power 0.12 by 2, hence the probability is 0.12² = 0.0144.
d) Again, we will assume that the probability doesnt change, because we replenish. The probability of a peanut being blue is 0.23. The probability of it not being blue is 0.77, so the probability of 6 peanuts not being blue is obtained from powering 0.77 by 6, hence it is 0.77⁶ = 0.2084
e) The event 'at least one peanut is blue' is te complementary event of 'none peanuts are blue', so the probability of this event is 1- 0.2084 = 0.7916
(184-94)/5=18
This means that she fills up 18 liters every minute. Thus she will be done in->
184(original amount)+(2 minutes (time passed during first data point)*18(rate of water)=184+36=220
To find the total time taken we divide 220 by 18 which is 220/18=12 2/9
Y = 5.5x is a linear equation (i.e. the highest power of the variables is 1). Therefore, the line will be a straight line with a slope of 5.5
Answer:
6 hours
Step-by-step explanation:
Let both of them plan for t hours to plant 111 trees n t hours
Melissa can plants 10 trees in 1 hour
in t hours she can plant 10 t trees
Jane plants 17 tree in 2 hours
in one hour Jane can plant 17/2 trees
in t hours she can plant (17/2)t trees.
Total trees planted by both of them in t hours in terms of t will be
10t + (17/2)t
= (10t*2 + 17t)/2
= (20t + 17t)/2
= 37t/2
but it is given that they planted 111 trees together
so 37t/2 should be equal to 111
37t/2 = 111
=> 37t = 111*2 = 222
=> t = 222/37 = 6.
Thus, it takes 6 hours for both of them to plant 111 trees together.
Answer:
388,800 ft^2.
Step-by-step explanation:
Scale = 1 : 180
Actual length, Ls = 180 × 4
= 720 ft
Actual width, Bs = 180 × 3
= 540 ft
Area of a rectangle = Ls × Bs
= 540 × 720
= 388,800 ft^2.