Annual demand for a product is 13,000 units; weekly demand is 250 units with a standard deviation of 40 units. The cost of placi

ng an order is $100, and the time from ordering to receipt is four weeks. The annual inventory carrying cost is $0.65 per unit.a. To provide a 98 percent service probability, what must the reorder point be?b. Suppose the production manager is told to reduce the safety stock of this item by 100 units. If this is done, what will the new service probability be?
Business
1 answer:
Pie2 years ago
5 0

Answer:

a. Reorder point is <u>1,164 units </u>to provide a 98 percent service probability.

b. the new service probability will be <u>79%</u> if production manager reduces the safety stock by 100 units.

Explanation:

a. To provide a 98 percent service probability, what must the reorder point be?

This can be calculated as follows:

Step 1: Calculation of optimal order quantity

The optimal order quantity also known as economic order quantity (EOQ) using the following formula:

EOQ = \sqrt{\frac{2 *D*O}{C} } ........................................... (1)

Where,

EOQ = Optimal order quantity = ?

D = Annual demands = 13,000

O = Ordering cost = $100

C = Carrying cost of annual inventory = $0.65 per unit

Substituting the values into equation (1), we have:

EOQ = \sqrt{\frac{2*13,000*100}{0.65} }

EOQ = \sqrt{\frac{2,600,000}{0.65} }

EOQ = \sqrt{4,000,000}

EOQ = 2,000 units

Step 2: Calculation of standard deviation during the lead time

This can be calculated using the following formula:

SL = \sqrt{L*(S)^{2} } ................................................. (2)

Where;

SL = Standard deviation during the lead time = ?

L = Lead time = 4

S = Standard deviation = 40

Substituting the values into equation (2), we have:

SL = \sqrt{4 *(40)^{2} }

SL = \sqrt{4*1,600}

SL =\sqrt{6.400}

SL = 80

Also, z = 2.05 from the standard normal distribution

Step 3: Calculation of reorder point

Total calculate reorder point, we use the following formula:

R = (d * L) + (z * SL) ............................................ (3)

Where;

R = Reorder point = ?

d = Weekly demand = 250

L = Lead time = 4

z = 2.05

SL = Standard deviation during the lead time = 80

Substituting the values into equation (3), we have:

R = (250 * 4) + (2.05 * 80)

R = 1,000 + 164

R = 1,164 units

Therefore, reorder point is <u>1,164 units</u> to provide a 98 percent service probability.

b. Suppose the production manager is told to reduce the safety stock of this item by 100 units. If this is done, what will the new service probability be?

ISS = Initial safety stock = z * SL = 2.05 * 80 = 164

If the safety stock is reduced by 100 units, we have:

NSS = New safety stock = ISS - 100 = 164 - 100 = 64

The new z (nz) can be obtained as follows:

NSS = nz * SL ................................................. (4)

Where;

NSS = 64

nz = new z = ?

SL = Standard deviation during the lead time = 80

Substituting the values into equation (4) and solve for nz, we have:

64 = nz * 80

nz = 64 / 80

nz = 0.80

For the new z, nz = 0.80, from Standard Normal distribution, the new service probability is 79%.

Therefore, the new service probability will be <u>79%</u> if production manager reduces the safety stock by 100 units.

You might be interested in
Select a business/company that you feel does not understand the psychology of waiting and provide examples in their process wher
kramer

Answer:

Let us pick the case of the organization known as Starbucks. Presently we will give 3 models according to which we feel that it doesn't comprehend the brain science of holding up in their procedure where they could deal with the client's view of standing by better utilizing the guideline from the Norman and Maister's articles. While holding up at a Starbucks behind a tremendous line, we can have numerous cases :  

a) Uncertain Waits Are Longer than Explained Waits - There is no clarification or sureness with respect to how a lot of time it will take for the espresso or your refreshment to be conveyed while you are in that line. This is questionable as the client's before you would request mass requests which may take additional time than only one espresso. In this way, these holds up are questionable.  

b) Occupied Time Feels Shorter than Unoccupied Time - While you are remaining in that line, you have an inclination that your 5-10 minutes have been squandered which you could have better used busy working or at home. In this manner, the time was abandoned and hence feels a waste. While on the off chance that the time was involved by some different methods in the line, at that point it would have been justified, despite all the trouble to remain in the line.  

c) Individual Waits Feel Longer than Group - Now very likely in a line, we will have people who are standing by solo for their request in the line. In this manner, the performance hold up will feel longer than holding up in an organization of companions or additionally little converses with outsiders or conveying here and there. In this manner, the issue of solo holding up is a distress and it remains.

5 0
2 years ago
Improving business processes by reengineering them, benchmarking specific activities against industry leaders, encouraging emplo
V125BC [204]

Answer: (C) Piecemeal productivity improvements

Explanation:

The piecemeal productivity improvement is one of the type of business strategy that is used by various types of successful organization for the purpose of improving the productivity of an employees, the business process and also managing all bench-marking activities in an organization.

 According to the given question, the given  activities in an organization are the example of Piecemeal productivity improvements that helps in expanding the product scope in the market. Therefore, Option (C) is correct answer.  

  Therefore, Option (C) is correct answer.

4 0
2 years ago
A company's sales in year 1 were $310,000 and in year 2 were $347,500. using year 1 as the base year, the percent change for yea
Vlad1618 [11]
(347500 - 310000) ÷ 310000 × 100% =

12.0968%
8 0
2 years ago
An automobile dealer expects to sell 1250 cars a year. The cars cost $9000 plus a fixed charge of $1000 per delivery. If it cost
Brilliant_brown [7]

Answer:

Order size = 50 cars

The number of orders=25

Explanation:

<em>The Economic Order Quantity (EOQ) is the order size that minimizes the balance of ordering cost and holding cost. At the EOQ, the carrying cost is equal to the holding cost.  </em>

It is computed using the formulae below  

EOQ = √ (2× Co× D)/Ch  

Co- Ordering cost, Ch- Carrying cost - D- Annual demand  

EOQ= √2× 1000× 1250/1000= 50

Number of cars to be ordered per time, i.e optimal order size= 50 cars

Order size = 50 cars

b)

The number of times orders should be placed per year would be calculated as follows:

The number of orders = Annual demand/ order size

The number of orders= 1250/50 = 25

The number of orders=25

4 0
2 years ago
DeMont Tax Services provides primarily two lines of service: accounting and tax. Accounting-related services represent 60% of it
pogonyaev

Answer:

Accounting revenue = $7,500,000

Tax revenue  = $5,000,000

Explanation:

Contribution margin is net of Sales price and variable cost per unit.

Break-even is the level of sales at which the business have no profit no loss. At this point business only covers the the variable and fixed cost.

Average contribution = (Revenue from Accounting x Contribution of accounting services ) + (Revenue from Tax x Contribution of Tax services )

Average contribution = (60% x 30%) + (40% x 40%) = 18% + 16% = 34%

Revenue at break-even = Fixed cost / Contribution margin ratio

Revenue at break-even = $4,250,000 / 34% = $12,500,000

Accounting revenue = $12,500,000 x 60% = 7,500,000

Tax revenue = $12,500,000 x 40% = 5,000,000

8 0
2 years ago
Other questions:
  • Why do communities resist programs to educate the public about hurricane hazards? they don't believe they have a hurricane probl
    14·1 answer
  • What is a typical or representative flow rate statistics?
    10·1 answer
  • What should Susan's three main talking points be to convince her Mom that she should file her own tax
    10·1 answer
  • BT Corporation has decided to build a new facility for its R&amp;D department. The cost of the facility is estimated at $125 mil
    13·1 answer
  • Nachman Industries just paid a dividend of D0 = $1.32. Analysts expect the company's dividend to grow by 30% this year, by 10% i
    5·1 answer
  • Kate has a 20-square-foot plot of land in her backyard that she uses to grow tomatoes and lettuce. Every square foot of land can
    10·2 answers
  • Your grandfather wants to establish a scholarship in his father’s name at a local university and has stipulated that you will ad
    12·1 answer
  • A manufacturing firm is considering two locations for a plant to produce a new product. The two locations have fixed and variabl
    14·1 answer
  • intext:"Pelcher Co. maintains a $400 petty cash fund. On January 31, the fund is replenished. The accumulated receipts on that d
    11·1 answer
  • Herman Company has three products in its ending inventory. Specific per unit data at the end of the year for each of the product
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!