Answer:
26 days
Step-by-step explanation:
If 6 days = rs. 2130
then 1 day = (2130 × 1) ÷ 6
Therefore 1 day = rs 355
For rs. 9230, the number of days he worked:
= 9230 ÷ 355
= 26 days
To answer this question, an assumption must be made, that Eva spends 8 hours a day working. If this is the case, then Eva will complete jobs w, x, and v on day one, for a total of six hours. Since the next job (y) requires 4 hours, she will spend two hours working that day, leaving 2 more hours to go on that job. The next day she will spend 2 hours finishing job y, completing it, and finish the longest job z (hours) that day. This means she had 4 jobs on day one, and 2 jobs on day 2 for and average of 3 jobs per day.
This answer assumes an 8 hour work day, and that Eva can start a job she cannot finish that day.
Answer:
Step-by-step explanation:
Given that a group of students estimated the length of one minute without reference to a watch or clock, and the times (seconds) are listed below.
Data set is as ollows:
70 79 38 63 44 23 62 61 67 50 61 70 94 87 65

H0: mu = 60 sec
Ha: mu not equals 60 sec
Mean diff = 2.27

Test statistic = 2.27/SE =0.4815
p value =0.6376
Since p>0.05, we accept null hypothesis
i.e. there is statistical evidence to say that students are reasonably good at estimating one minute