Answer:
The first box will have 90 marbles, the second 180 and the third 270.
Step-by-step explanation:
Division in a ratio of 1:2:3
1 + 2 + 3 = 6
So
The first box will have 1/6 of the marbles.
The second box will have 2/6 = 1/3 of the marbles
The third box will have 3/6 = 1/2 of the marbles.
First box:
One sixth, so:
(1/6)*540 = 540/6 = 90
Second box:
One third, so:
(1/3)*540 = 540/3 = 180
Third box:
One half, so:
(1/2)*540 = 540/2 = 270
The first box will have 90 marbles, the second 180 and the third 270.
We are given that 76 persons can complete the job in 42 days.
We need to find the number of days will 56 persons do the same job.
Let us assume that in x number of days will 56 persons do the same job.
Number of days taken by 1 person to complete same work = 76 × 42 =3192 days.
56 person will take =
= 57.
<h3>
Therefore, 57 days will 56 persons do the same job.</h3>
Answer:
Step-by-step explanation:
to find the arithmetic sequence with a4=-1 and a6=-13
first: find the difference: an=a+(n-1)d
a4=-1
that means a1+d(4-1)=-1 ( since a4 given and need to find a1)
a1+3d=-1 first equation
a1+d(6-1)=-13 ( a6 is given)
a1+5d=-13 second equation
a1+3d=-1
a1+5d=-13 ( find a and d by subtraction)
a1+3d-a1-5d=-1-(-13)
2d=12
d=-12/2=-6 ( substitute d in the equation: a1+3d=-1)
difference =-6
a1=17
a1,a2,a3,a4,a5,a6,....
the sequence is : 17,11,5,-1,-7,-13,.....
hope it works
Add all the numbers together and the difference is the answer which is 44%