Answer:
The final bill will cost $1,250.
Step-by-step explanation:
1000(0.7) = 70
1000(0.18) = 180
1000 + 180 + 70 = 1250
Answer:
53 teachers
Step-by-step explanation:
Basically, what we need to do here is to find how many teachers there need to be, first. If there are 6,734 students in the school district and if maximum class size is 25, then the number of teachers needed is:
6,734 / 25 = 269.36
Of course, it's obvious that we can't have a decimal number of teachers, so we need to find integer (269 or 270).
If we take 269 teachers and 25 students per class, we get:
269 • 25 = 6,725 students, which is not enough, since there are 6,734 students.
That means that the number of teachers needed is 270.
It is given that there are already 217 teachers, meaning that 270-217=53 teachers have to be supplemented.
Finding the slope of both coordinates, you'll get 15/2. The slopes are the same
Answer:
II case.
Step-by-step explanation:
Given that a catering company prepared and served 300 meals at an anniversary celebration last week using eight workers.
The week before, six workers prepared and served 240 meals at a wedding reception.
Productivity is normally measured by number of outputs/number of inputs
Here we can measure productivity as
no of meals served/no of workers
In the I case productivity =
In the II case productivity = 
Obviously II case productivity is more as per worker 40 meals were served which is more than 37.5 meals per worker in the I case.
To solve this question, you need to find how long jump is. For 2m high with <span>1.67 m/s2 it would be:
h= 1/2 gt^2
2= 1/2 * (1.67) t^2
t^2= 1.67
t= 1.29
If the speed is 20 mph and the jump is 2 second, the distance traveled would be:
20 miles/ hour * 1.29 second * (1 hour/3600second)= 0.007179 miles
If you need to convert it to meter then: </span>0.007179 mile * 1609.34meter/ mile= 11.55 meter