nata0808 [166]
1 year ago
12

Kahuna Industries has two manufacturing departments--Fabrication and Finishing. The company used the following data at the begin

ning of the year to calculate pre-determined overhead rates:
Fabrication Finishing Total
Estimated total machine-hours (MHs) 4,000 1,000 5,000
Estimated total fixed manufacturing overhead cost $30,000 $3,400 $33,400
Estimated variable manufacturing overhead cost
per machine-hour $2.00 $4.00
During the most recent month, the company started and completed two jobs--Job 14-X and Job 15-Z. There were no beginning inventories. Data concerning those two jobs follow:
Job 14-X Job 15-Z
Direct materials $14,700 $8,400
Direct labor cost $21,600 $8,400
Fabrication machine-hours 2,700 1,300
Finishing machine-hours 400 600
Assume that the company uses a plantwide pre-determined manufacturing overhead rate based on machine-hours. The total manufacturing cost assigned to Job 15-Z is closest to:______.
Business
1 answer:
Morgarella [4.7K]1 year ago
5 0

Answer:

Total manufacturing cost= $34,052

Explanation:

<u>First, we need to calculate the predetermined overhead rate:</u>

Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

Total estimated overhead= 33,400 + (2*4,000 + 4*1,000)

Total estimated overhead=  $45,400

Predetermined manufacturing overhead rate= 45,400 / 5,000

Predetermined manufacturing overhead rate= $9.08 per machine hour

<u>Now, we can determine the total manufacturing cost of Job 15-Z:</u>

Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base

Allocated MOH= (1,300 + 600)*9.08= $17,252

Total manufacturing cost= 8,400 + 8,400 + 17,252

Total manufacturing cost= $34,052

You might be interested in
On December 31, 2021, Gardner Company holds debt securities classified as HTM with a face amount of $100,000 and a carrying valu
Liono4ka [1.6K]

Answer:

there are no options, but the journal entry should be:

Dr Cash 2,500

Dr Investment in bonds 350

    Cr interest revenue 2,850

Explanation:

Since the bonds' carrying value is less than the face value, it means that Gardner Company purchased them at a discount. When the bonds were purchased, the investment in bonds account's balance was not $100,000 (the par value), instead it was recorded at the lower amount at which they were purchased. As coupon payments are received, the discount on the bonds is amortized and their carrying value should increase until it reaches par value on maturity date.

4 0
2 years ago
Bond A pays $4,000 in 14 years. Bond B pays $4,000 in 28 years. (To keep things simple, assume these are zero-coupon bonds, whic
Arlecino [84]

Answer and Explanation:

Given that Bond A pays $4,000 in 14 years and Bond B pays $4,000 in 28 years, and that the interest rate is 5 percent, we see that Using the rule of 70, the value of Bond A is 70/5 = doubled after 14 years. Now if its value is 4000 in 14 years, its current value must be halved. Hence the value is 2000.

Sinilarly the value of Bond B is approximately one fourth now because it pays 4000 in 28 years. Hence its value is 4000/4 = 1000.

Now suppose the interest rate increases to 10 percent. Hence the doubling time is 70/10 = 7 years

Using the rule of 70, the value of Bond A is now approximately 1,000 and the value of Bond B is 250

Comparing each bond’s value at 5 percent versus 10 percent, Bond A’s value decreases by a smaller percentage than Bond B’s value.

The value of a bond falls when the interest rate increases, and bonds with a longer time to maturity are more sensitive to changes in the interest rate.

8 0
1 year ago
Emerald Statuary manufactures bust statues of famous historical figures. All statues are the same size. Each unit requires the s
Inessa05 [86]

Answer:

a) Sales volume variance = $1496000 unfavorable

flexible-budget variance = $192000 favorable

b) For direct materials

Price variance = `$135000 unfavorable

efficiency variances = $527920 favorable

For direct manufacturing labor

Price variance = `$36600 unfavorable

efficiency variances = $914815 favorable

Explanation:

a) Sales volume variance = (Actual units sold - Budgeted units sold) x Budgeted price per unit = (4800 - 7000) × $680 = $1496000 unfavorable

flexible-budget variance =  (Actual price - Budgeted price) x Actual units sold= ($720 - $680) × 4800 = $192000 favorable

b) For direct materials

Price variance = (Actual cost - standard cost) x Actual quantity of units purchased = ($5.95/ pound - $8/pound) × 66000 pound= `$135000 unfavorable

efficiency variances = (Actual unit - Standard unit) x Standard cost per unit = (66000 pound - 10 pound) × $8 per pound= $527920 favorable

For direct manufacturing labor

Price variance = (Actual cost - standard cost) x Actual hours = ($48/hour - $50/hour) × 18300 hours = `$36600 unfavorable

efficiency variances = (Actual hours - Standard hours) x Standard cost per hour= (18300 hour - 3.7 hour) × $50/hour = $914815 favorable

4 0
2 years ago
Each machine must be run by one of 19 cross-trained workers who are each available 35 hours per week. The plant has 10 type 1 ma
Mrac [35]

Answer:

The Linear programming model is given as below

Profit Function: P=90X+120Y+150Z

Constraints:

2X+2Y+Z\leq 400

3X+4Y+6Z\leq 240

4X+6Y+5Z\leq 320

\dfrac{2X+2Y+Z}{40}\leq 10

\dfrac{3X+4Y+6Z}{40}\leq 6

\dfrac{4X+6Y+5Z}{40}\leq 8

\dfrac{2X+2Y+Z}{35}+\dfrac{3X+4Y+6Z}{35}+\dfrac{4X+6Y+5Z}{35}\leq 19

Explanation:

As the question is not complete, the complete question is found online and is attached herewith.

Let the number of product 1 to be produced is X, that of product 2 is Y and product 3 is Z

so  the maximizing function is the profit function which is given as

P=90X+120Y+150Z

Now as the number of hours in a week are 40 and there are a total of 10 type 1 machines so the total number of machine 1 hours are 40*10=400 hours

As from the given table product 1 uses 2 machine hours of machine 1, product 2 uses 2 machine hours of machine 1 and product 3 uses 1 hour of machine 1 so

2X+2Y+Z\leq 400

Now as the number of hours in a week are 40 and there are a total of 6 type 2 machines so the total number of machine 2 hours are 40*6=240 hours

As from the given table product 1 uses 3 machine hours of machine 2, product 2 uses 4 machine hours of machine 2 and product 3 uses 6 hour of machine 2 so

3X+4Y+6Z\leq 240

Now as the number of hours in a week are 40 and there are a total of 8 type 3 machines so the total number of machine 3 hours are 40*8=320 hours

As from the given table product 1 uses 4 machine hours of machine 3, product 2 uses 6 machine hours of machine 3 and product 3 uses 5 hour of machine 3 so

4X+6Y+5Z\leq 320

Now as the machine 1 is used as 2X+2Y+Z in a week and the week is of 40 hours so the number of machines to be used are given as

\dfrac{2X+2Y+Z}{40}\leq 10

Now as the machine 2 is used as 3X+4Y+6Z in a week and the week is of 40 hours so the number of machines to be used are given as

\dfrac{3X+4Y+6Z}{40}\leq 6

Now as the machine 3 is used as 4X+6Y+5Z in a week and the week is of 40 hours so the number of machines to be used are given as

\dfrac{4X+6Y+5Z}{40}\leq 8

Now the workers are available for 35 hours so the worker available at the machine 1 is given as

\dfrac{2X+2Y+Z}{35}

That of machine 2 is given as

\dfrac{3X+4Y+6Z}{35}

That of machine 3 is given as

\dfrac{4X+6Y+5Z}{35}

As the total number of workers is 19 so the constraint is given as

\dfrac{2X+2Y+Z}{35}+\dfrac{3X+4Y+6Z}{35}+\dfrac{4X+6Y+5Z}{35}\leq 19

So the Linear programming model is given as below

Profit Function: P=90X+120Y+150Z

Constraints:

2X+2Y+Z\leq 400

3X+4Y+6Z\leq 240

4X+6Y+5Z\leq 320

\dfrac{2X+2Y+Z}{40}\leq 10

\dfrac{3X+4Y+6Z}{40}\leq 6

\dfrac{4X+6Y+5Z}{40}\leq 8

\dfrac{2X+2Y+Z}{35}+\dfrac{3X+4Y+6Z}{35}+\dfrac{4X+6Y+5Z}{35}\leq 19

4 0
2 years ago
Dobson Contractors is considering buying equipment at a cost of $75,000. The equipment is expected to generate cash flows of $15
Alex787 [66]

Answer: d. $1,534 positive net present value of the cash flows. Based on present value considerations, Dobson Construction should buy the machine.

Explanation:

To calculate the Net Present Value, we take the present values of all the future cashflows and subtract the initial cost from this amount.

Now, the cashflows are stable and this means that we can use the Present Value of an Annuity factor to find out the present value of the cashflows. We can then use a simple present value formula to find out the PV of the sale price.

I have attached a table that shows the PVIFA factors to make our calculations easier.

With interest rates at 12% and the year being 8 years, the PVIFA factors is 4.9676

Calculating therefore we have,

= 15,000 * 4.9676

= $74,514

This is the present value of 8 years of $15,000 cash flows.

In the same year, the machine can be sold for $5,000 so the present value of that is,

= 5000 / ( 1 + 12%)^8

= $2,020

Adding those together we get,

= 74,514 + 2,020

= 76,534

= $76,534

Subtracting the original cost we have,

= 76,534 - 75,000

= $1,534 in positive cashflow.

Net Present Value = $1,534

This means that Based on present value considerations, Dobson Construction should buy the machine due to a $1,534 positive net present value.

7 0
1 year ago
Other questions:
  • Mario and luigi want to open up a pizza place. they have determined that the rent will cost them $2,000 per month and administra
    9·1 answer
  • Most frequent pattern mining algorithms consider only distinct items in a transaction. however, multiple occurrences of an item
    15·2 answers
  • If _________ is constrained, we should __________ the staffing level to lower capacity.
    8·1 answer
  • Fred is a new employee who has been assigned to your team. This is the first time Fred has worked in your country. Aware that he
    9·1 answer
  • Dawn Corp. uses a standard cost system. During the year, both the labor rate variance and the labor efficiency variance were unf
    8·1 answer
  • What type of international risk exposure measures the change in present value of a firm resulting from changes in future operati
    11·1 answer
  • An entrepreneur has purchased a gym franchise and been very disappointed in the results. The franchise has not earned what the e
    9·1 answer
  • Connor Lamps Inc. purchased factory equipment in January 2015 for $575,000. In March 2018, this equipment was sold for $105,000
    7·1 answer
  • Duffert Industries has total assets of $1,080,000 and total current liabilities (consisting only of accounts payable and accrual
    14·1 answer
  • . What can the ALSA learn from this experience to help the organization take advantage of the power of social media in the futur
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!