Answer:
A. $73,000
Explanation:
When a company is protected by a hedge it pays the forward exchange rate of the day it entered into the forward contract when payment date has come.
The Question is incomplete. Below are the missing parts and attached picture with spot rate and forward exchange rate.
Select one:
A. $73,000
B. $72,700
C. $73,200
D. $75,000
Answer:
The function that would determine the cost in dollars, c(z), of mailing a letter weighing z ounces is (0.46 + 0.20z)
Explanation:
Weight of the letter = z ounces (z is an integer greater than 1)
cost to mail a letter weighing 1 ounce = $0.46
cost to mail an additional ounce = $0.20
cost to mail z additional ounces = z × $0.20 = $0.20z
Total cost of mailing a letter weighing z ounces = $0.46 + $0.20z
Therefore, cost function, c(z) = 0.46 + 0.2z
Answer:
Given: Total shift time = 8 hours = 8 * 60 = 480 minutes
time required for production of one saw = 6 minutes
Demand for Bow saw = Demand for frame saw = Demand for dovetail saw = 1/2 * Demand of Tenon saw
a) Mixed model schedule:
Mixed model schedule
Product no. per batch
Bow Saw 1
Frame Saw 1
Dovetail Saw 1
Tenon Saw 2
Total 5
Therefore 2 Tenon Saw, and each bow, frame, and dovetail saws will be produced before the cycle is repeated.
b) 2 Tenon Saw, 1 bow, 1 frame, and 1 dovetail saws will be produced under production sequence for one unit production.
The length of cycle will be 5*6=30 minutes i.e. the cycle will repeat once in 30 minutes for 8 hours means totally it will repeat 16 times during one shift.
c) Number of saws Swenson produce in one shift = Number of Bow saw Swenson produce in one shift + Number of Frame saw Swenson produce in one shift + Number of Dovetail saw Swenson produce in one shift + Number of Tenon saw Swenson produce in one shift
Explanation:
Answer:
Cost of equity, re= 0.098356 or 9.84 %
Explanation:
D1 = $ 1.25
P0 = $ 27.50
gL = 5 % = 0.05
F = 6 % = 0.06
Cost of equity, re can be calculated using the formular below:
Cost of equity, re = D1/ {P0 x (1- F)} + gL
= $ 1.25 / {$ 27.50 x (1- 0.06)} + 0.05
= $ 1.25 / ($ 27.50 x 0.94) + 0.05
= $ 1.25 / 25.85 + 0.05
= 0.048356 + 0.05
Cost of equity, re= 0.098356 or 9.84 %
Answer:
They Developed on-the job training and learning. They used the plant to train their employees at the same time the plant is fully operational and employees are training too.
Explanation: