answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
rusak2 [61]
2 years ago
8

Amanda buys a ruby for $330 for which she was willing to pay $340. the minimum acceptable price to the seller, tony, was $140. a

manda experiences: a consumer surplus of $10 and tony experiences a producer surplus of $190. a producer surplus of $200 and tony experiences a consumer surplus of $10. a consumer surplus of $670 and tony experiences a producer surplus of $200. a producer surplus of $10 and tony experiences a consumer surplus of $190.
Business
1 answer:
OverLord2011 [107]2 years ago
4 0
Amanda's consumer surplus is $10, since the ruby was worth $10 more than she paid for it. Tony was willing to sell the ruby for a minimum of $140, and received $330, making his producer surplus $190.
Answer: Amanda: consumer surplus of $10. Tony: producer surplus of $190
You might be interested in
Cardiff and Delp is an architectural firm that provides services for residential construction projects. The following data perta
Ganezh [65]

Answer:

Activity Rates

Consultation  $150

Drawings        $58

Modeling         $0.7

supervision       $190

Billings              $1037.5

Collections       $1642.5

Total overhead allocated: $ 126,826

Explanation:

First, we divide the cost of each activity over the base total to get the rate.

\left[\begin{array}{ccccc}$Activity&Driver&cost&Total&Rate\\$Consultation&$contact hours&315000&2100&150\\$Drawings&$desing hours&104400&1800&58\\$Modeling&$square feet&32200&46000&0.7\\$supervision&$days&228000&1200&190\\$Billings&$jobs&8300&8&1037.5\\$Collections&$jobs&13140&8&1642.5\\\end{array}\right]

Now we apply this rate against the job activity measurement:

\left[\begin{array}{ccccc}$Activity&Job&$Rate&$Allocated\\$Consultation&410&150&61500\\$Drawings&352&58&20416&\\$Modeling&7400&0.7&5180&\\$supervision&195&190&37050&\\$Billings&1&1037.5&1037.5&\\$Collections&1&1642.5&1642.5&\\$Total&&&126826&\\\end{array}\right]

3 0
2 years ago
Selected sales and operating data for three divisions of different structural engineering firms are given as follows: Division A
USPshnik [31]

Answer:

20% is the ROI of division A

8% is the ROI of division B

16% is the  ROI of division C

Explanation:

Find the attachments for the explanation

7 0
2 years ago
A Process Breakdown Structure can provide a reasonable alternative to a Work Breakdown structure for an extensive development pr
creativ13 [48]

Answer: phase exit criteria is firmly establish

Explanation:

A work breakdown structure simply has to do with the completion of tasks in order to get the final product. The aim of the work breakdown structure is to keep project members focused and achieve their goals.

Process Breakdown Structure can provide a reasonable alternative to a work breakdown structure for an extensive development project if the phase exit criteria is firmly establish.

6 0
2 years ago
a. If Alpha produced 6 pearls and 15 pineapples while Beta produced 30 pearls and 8 pineapples before they decided to trade, how
Mazyrski [523]

Answer:

Alpha will produce no pearls and Beta will produce 60 pearls, increasing the combined production from 36 pearls.

Explanation:

A comparative advantage of a country is defined if the country is able to produce a product with the least opportunity cost than its trade partner countries.

So first we calculate the cost of producing each good for each of the countries.

For Alpha:

      1 pearls = 15/6 pineapples

      1 pearls = 2.5 pineapples

Similarly,

      1 pineapple = 6/15 pearls

      1 pineapple = 0.4 pearls

So for Alpha, the opportunity cost of producing one pearl is 2.5 pineapple, to produce 1 pineapple, Alpha has to sacrifice 0.4 pearls.

Opportunity cost for Beta:

      1 pearls = 8/30 pineapples

      1 pearls = 0.27 pineapples

Similarly:

      1 pineapple = 30/8 pearls

      1 pineapple = 3.75 pearls

So for Beta, the opportunity cost of producing one pearl is 0.27 pineapple, to produce 1 pineapple, Alpha has to sacrifice 3.75 pearls.

It can be seen that the opportunity cost of producing pineapples is least for Alpha, Beta has the lowest opportunity cost for producing pearls. So Alpha will export pineapples while Beta will export pearls.

Thus if both decide to trade produce only that good in which it has the opportunity cost, then Alpha's production of pineapple will be

15 + 2.5 X 6 = 15+15 = 30  pineapple

While Beta's production of pearls will be

30 + 3.75 X 8 = 30 + 30 = 60 pearls.

So Alpha will produce no pearls and Beta will produce 60 pearls, increasing the combined production from 36 pearls.

3 0
2 years ago
Suppose a movie theater determines it can charge different prices to patrons who go to weekday matinees and people who attend ev
bija089 [108]

Answer:

increase the price of weekend and evening tickets

decrease the price of matinee tickets

Explanation:

If the price elasticity of demand is elastic, a small change in the price of movie tickets will cause a larger change in the quantity demanded. If the price elasticity of demand is inelastic, a large change in the price will cause a small change in the quantity demanded.

If the PED for weekend and evening patrons is inelastic, then the movie theater should increase the price of the weekend and evening tickets in order to increase total revenue. In this case, a 10% increase in price will result in a 5% decrease in sold tickets.

If the PED for matinee patrons is elastic, then the movie theater should decrease the price of the matinee tickets in order to increase total revenue. In this case, a 10% decrease in price will result in a 17% increase in sold tickets.

7 0
2 years ago
Other questions:
  • One of the benefits of mindfulness is that it enables you to
    13·1 answer
  • Suppose you’ve already received your free credit reports this year. Give 3 situations in which the credit bureaus would have to
    7·1 answer
  • A toy manufacturer uses approximately 32,000 silicon chips annually. The chips are used at a steady rate during the 240 days a y
    5·1 answer
  • Aggregation in sales and operations planning is by groups of customers on the supply side and by product families on the demand
    15·2 answers
  • The Work in Process Inventory account had a beginning balance of $16,200 on April 1. During April, the cost of direct materials
    14·1 answer
  • A football game between the Thunder and the Sharks is in its closing minutes, with the Thunder ahead by 20 points. The Thunder’s
    7·1 answer
  • Doubling the capacity of a bottleneck operation would theoretically always double the capacity of the process. Ignore waiting ti
    8·1 answer
  • Purves Corporation is using a predetermined overhead rate that was based on estimated total fixed manufacturing overhead of $121
    7·1 answer
  • Calvert Corporation expects an EBIT of $25,300 every year forever. The company currently has no debt, and its cost of equity is
    11·1 answer
  • Presented below is a combined single-step income and retained earnings statement for Hardrock Mining Co. for 2017.
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!