Answer:
B
Step-by-step explanation:
Mathematically, we shall be using the z-score here
Z-score = (x-mean)/SD
From the question, mean = 80 and SD = 4
So we want to get the option in the question that has a z-score of 1 or below
Let’s look at 75
80-75 = 5 ( this is clearly above 1 standard deviation of 4)
For 77;
80 -77 = 3
This is less than the standard deviation of 4, meaning it is within 1 standard deviation of the mean
Multiply each side by 9:
18 + 4x > 36 + 9x
Subtract 18 from each side:
4x > 18 + 9x
Subtract 9x from each side:
-5x > 18
Divide each side by -5:
x < -3.6
Hope this helps!

For these lines, let

.

And for these, let

.
Now,

The vertices of

in the x-y plane are (0, 2), (2/3, 10/3), (2, 2), and (4/3, 2/3). Applying

to each of these yields, respectively, (2, 2), (2, 4), (-2, 4), and (-2, 2), which are the vertices of a rectangle whose sides are parallel to the u-v plane.
Answer:
Step-by-step explanation:
(a)
Total cost = (7 items * Cost per item) + Shipping fee = 7*6.5 + 8.5 = $54
(b)
Modelling the above equation with symbols:
c = s*6.5 + 8.5 = 6.5s + 8.5
(c)
For a total cost of 80$, c = 80:
80 = 6.5s + 8.5
Calculating, we get:
s = 11 items
Rachel ordered a total of 11 items