answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Andrei [34K]
2 years ago
8

Travis Thompson uses his credit card to obtain a cash advance of​ $600 to pay for his textbooks in medical school. The interest

rate charged for the loan is 0.04285​% per day. Travis repays the money plus the interest after 21 days.
​a) Determine the interest charged for the cash advance.

​b) When he repaid the​ loan, how much did he pay the credit card​ company?
Mathematics
1 answer:
Katyanochek1 [597]2 years ago
5 0

Answer:

(a) $5.3991

(b) 605.3991

Step-by-step explanation:

(a)

Taking this as simple interest

Interest= \frac {PRT}{100}

where P is principal amount which in this case is $600, R is the rate in percentange which in this case is 0.04285% and T is the duration which in this case is 21 days. Substituting these we have

Interest= ($600*0.04285*21)/100

Interest=$5.3991

(b)

Amount repaid is combination of interest and principal amount

Amount=$600+$5.3991

=$605.3991

Ans=$605.3991

You might be interested in
Of the following people in the concentration camp , who behaves kindly to wiesel and his father
In-s [12.5K]
The answer is Bela Katz
4 0
2 years ago
Suppose that a high school marching band has 125 members. Of these 125 band members, 41 are seniors, 24 play the trumpet, and 10
Alborosie

Answer:

<em>The probability is 42%</em>

Step-by-step explanation:

<u>Conditional Probability</u>

It's the probability of the occurrence of an event B knowing that an event A has already occurred and A and B are related (not independent).

If P(A) is the probability of occurrence of A, P(A\cap B) is the probability of both events to occur, and P(B|A) is the required probability occurrence of B:

\displaystyle P(B|A)=\frac{P(A\cap B)}{P(A)}

We know a high school marching band has 125 members, from which 41 are seniors (event B), 24 play the trumpet (event A), and 10 are seniors who play the trumpet.

The probability that a randomly selected band member plays the trumpet is

\displaystyle P(A)=\frac{24}{125}

The probability that he or she has both attributes is

\displaystyle P(A\cap B)=\frac{10}{125}

Thus, the required conditional probability is

\displaystyle P(B|A)=\frac{\frac{10}{125}}{\frac{24}{125}}

\displaystyle P(B|A)=\frac{10}{24}=\frac{5}{12}=0.42

The probability is 42%

5 0
2 years ago
Each of the following phrases describes a numerical value:
DanielleElmas [232]

Answer: C

Step-by-step explanation:

The answer is C

Step-by-step explanation:

C The opposite of 9 is the same distance from 0 on a number line as the absolute value of 9.

Absolute value is the distance from zero on a number line of and number positive or negative.

7 0
2 years ago
Read 2 more answers
In a local ice sculpture contest, one group sculpted a block into a rectangular based pyramid. The dimensions of the base were 3
m_a_m_a [10]

Answer:

1. The amount of ice needed = 18 m²

2. The amount of fabric needed to manufacture the umbrella is 0.76 m²

3. The height of the cone, is 3.75 cm

4. The dimensions of the deck are;

Width = 28/3 m, breadth = 28/3 m

The area be 87.11 m²

5.   The dimensions of the optimal design for setting the storage area at the corner, we have;

Width = 10m

Breadth = 10 m

The dimensions of the optimal design for setting the storage area at the back of their building are;

Width = 7·√2 m

Breadth = 7·√2 m

Step-by-step explanation:

1. The amount of ice needed is given by the volume, V, of the pyramid given by V = 1/3 × Base area × Height

The base area = Base width × Base breadth = 3 × 5 = 15 m²

The pyramid height = 3.6 m

The volume of the pyramid = 1/3*15*3.6 = 18 m²

The amount of ice needed = 18 m²

2. The surface area of the umbrella = The surface area of a cone (without the base)

The surface area of a cone (without the base) = π×r×l

Where:

r = The radius of the cone = 0.4 m

l = The slant height = √(h² + r²)

h = The height of the cone = 0.45 m

l = √(0.45² + 0.4²) = 0.6021 m

The surface area = π×0.4×0.6021 = 0.76 m²

The surface area of a cone (without the base) = 0.76 m²

The surface area of the umbrella = 0.76 m²

The amount of fabric needed to manufacture the umbrella = The surface area of the umbrella = 0.76 m²

3. The volume, V, of the cone = 1/3×Base area, A, ×Height, h

The volume of the cone V = 150 cm³

The base area of the cone A = 120 cm²

Therefore we have;

V = 1/3×A×h

The height of the cone, h = 3×V/A = 3*150/120 = 3.75 cm

4. Given that the deck will have railings on three sides, we have;

Maximum dimension = The dimension of a square as it is the product of two  equal maximum obtainable numbers

Therefore, since the deck will have only three sides, we have that the length of each side are equal and the fourth side can accommodate any dimension of the other sides giving the maximum dimension of each side as 28/3

The dimensions of the deck are width = 28/3 m, breadth = 28/3 m

The area will then be 28/3×28/3 = 784/9 = 87\frac{1}{9} =87.11 m²

5. The optimal design for setting the storage area at the corner of their property with four sides is having the dimensions to be that of of a square with equal sides of 10 m each as follows;

Width = 10m

Breadth = 10 m

The optimal design to have the storage area at the back of their building having a fence on only three sides, is given as follows;

Storage area specified = 98 m²

For optimal use of fencing, we have optimal side size of fencing = s = Side length of a square

s² = 98 m²

Therefore, s = √98 = 7·√2 m

Which gives the width = 7·√2 m and the breadth = 7·√2 m.

8 0
2 years ago
Alia wants to write the equation of the graphed line in point-slope form. These are the steps she plans to use:
baherus [9]
(2,5)(1,3)
slope(m) = (3 - 5) / (1 - 2) = -2/-1 = 2 (2 units up, one unit to the right)

y - y1 = m(x - x1)....using (1,3)
y - 3 = 2(x - 1)....talia's last step is incorrect because she didn't sub in her slope of 2
6 0
2 years ago
Read 2 more answers
Other questions:
  • Sean began jogging to live a healthier lifestyle. On his first run, he ran one-half mile. He increased his workouts by adding tw
    5·2 answers
  • Select the correct answer from each drop-down menu. A self-service car wash charges $4 for the initial 5 minutes plus an additio
    15·2 answers
  • Consider the following equivalent expressions: 38÷1312 and 38⋅ab. What are the values of a and b? Give the value of a followed b
    6·1 answer
  • On a coordinate plane, a piecewise function has 2 lines. The first line has a closed circle at (0, 3) and then goes down through
    6·2 answers
  • Pete’s return from selling his investment is $22,000. He had purchased the investment at a cost of $20,000. What is Pete’s retur
    11·1 answer
  • Let U1, ..., Un be i.i.d. Unif(0, 1), and X = max(U1, ..., Un). What is the PDF of X? What is EX? Hint: Find the CDF of X first,
    12·1 answer
  • The equation y = 1.55x + 110,419 approximates the total cost, in dollars, of raising a child in the United States from birth to
    15·1 answer
  • John should drive to his workplace and back to home. On the way to the workplace it was raining, so he drove at speed of 42mph.
    15·1 answer
  • Mikayla has $32 in her piggy bank. Her sister, Jessica, has $21. Mikayla earns $10 a week by doing chores for her grandparents,
    15·1 answer
  • Tonya plans to join a fitness club. She researched the costs to join different clubs in her area and found that there is a linea
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!