Answer:
Fatec – SP) Seja A um ponto pertencente à reta r, contida no plano α. É verdade que:
a) existe uma única reta que é perpendicular à reta r no ponto A.
b) existe uma única reta, não contida no plano α, que é paralela à reta r.
c) existem infinitos planos distintos entre si, paralelos ao plano α, que contém a reta r.
d) existem infinitos planos distintos entre si, perpendiculares ao plano α e que contêm a reta r.
e) existem infinitas retas distintas entre si, contidas no plano α e que são paralelas à reta r.
2. (UF – AL) Classifique como verdadeira ou falsa cada uma das afirmativas abaixo.
1) Duas retas que não têm pontos com
Answer:
option B
Explanation:
The correct answer is option B
Seaming is an operation in which the edges are folded over another part to achieve the tight fit.
Seaming is generally used to join other parts together.
So, seaming is generally used for producing fluid-tight joints.
This process is used in the food industry on canned goods, metal roofing, and in the automotive industry.
Answer:
#Initialise a tuple
team_names = ('Rockets','Raptors','Warriors','Celtics')
print(team_names[0])
print(team_names[1])
print(team_names[2])
print(team_names[3])
Explanation:
The Python code illustrates or printed out the tuple team names at the end of a season.
The code displayed is a function that will display these teams as an output from the program.
Answer:
a) civil engineering.
Explanation:
Civil engineering is a professional engineering program that deals with the construction, design, and maintenance of all the natural and man-made environments including dams, buildings, railways, and roads.
Civil engineering is the branch of engineering that is the practice not restricted because civil engineer is not restricted to academic profession but practice in designing and construction can make someone a professional civil engineer.
Hence, the correct answer is "a)."
Answer:
The time taken will be "1 hour 51 min". The further explanation is given below.
Explanation:
The given values are:
Number of required layers:
= 
= 
Diameter (d):
= 1.25 mm
Velocity (v):
= 40 mm/s
Now,
The area of one layer will be:
= 
= 
The area covered every \second will be:
= 
= 
= 
The time required to deposit one layer will be:
= 
= 
The time required for one layer will be:
= 
∴ Total times required for one layer will be:
= 
= 
So,
Number of layers = 152
Therefore,
Total time will be:
= 
= 
= 