Answer:
The answer is: The total value of GDP is $2 Billion
Explanation:
The formula for calculating GDP is:
GDP = C + I + G + (X – M) = $1,000 MM + $200 MM + $600 MM + $200 MM
GDP = $2,000 MM (or $2 Billion)
- consumption: $1 billion ($400 MM consumers + $600 MM businesses)
- investment: $200 MM (change in inventories)
- government: $600 MM
- exports - imports: $200 MM (no imports)
Answer:
Year Cashflow [email protected]% PV [email protected]% PV
$ $ $
0 (1,100) 1 (1,100) 1 (1,100)
1-8 47.4 5.3349 252.87 7.0197 332.73
8 1,000 0.4665 465.5 0.7894 789.4
NPV (381.63) NPV 22.13
Kd = LR + NPV1/NPV1+NPV2 x (HR – LR)
Kd = 3 + 22.13/22.13 + 381.63 x (10 – 3)
Kd = 3 + 22.13/403.76 x 7
Kd = 3 + 0.38
Kd = 3.38%
Explanation:
Cost of debt is calculated based on internal rate of return formula. In year 0, we will consider the current market price of the bond as cashflow. In year 1 to 8, we will consider the after-tax coupon as the cashflow. The after-tax coupon is calculated as R(1 - T). R is 6% x $1,000 = $60 and tax is 21%. Thus, we have $60(1 - 0.21) = $47.4. then we will discount the cashflows for 8 years so as to obtain the internal rate of return. The internal rate of return represents cost of debt.
Answer:
EPS will be higher than $2.38
Explanation:
The Earnings per share is the value available to stockholders of the company after the deduction of all the expense and taxes. Restructuring expense are one time expense and they are reported as other operating expenses in the Income Statement. The inclusion of restructuring and other one-time charges in the Income Statement results in lower Earnings before Tax and ultimately reduced net profit. If these cost are excluded the Earning will rise which will give rise to EPS of the company.
Answer:
Explanation:
im sorry i just need points sorry ask someone else sorry ;)
As a project manager, Mallory needs to make sure that her geographically dispersed team members can interact and have the same information, templates, and documentation. Which of the following tools should she consider using?
A) Wiki
B) Podcast
C) Blog
D) Video conference software
Answer:
The correct answer is D) Video Conference software
Explanation:
The rise of the Internet and development of collaborative software have instilled a new dimension into project management.
Projects can now be managed virtually through video conferencing tools.
Where geographical proximity, is a challenge, the elected method of communication should provide room for instantaneous two-way communication (that is giving and receiving of information) without giving room for any misunderstanding.
Some video conferencing tools allow for virtual face to face communication as well as exchange of templates and documentation.
Given the options above, Video Conferencing software is the best choice as it allows real time feed, observation of emotional cues, and pretty much a good alternative to face to face communication.
Cheers!