answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Yuki888 [10]
2 years ago
15

A group of adults and students went on a class trip to Washington, DC. The number of male students was 1 more than 7 times the n

umber of adults. The number of female students was half the number of male students. If the total number of people who went on the trip is 82, find the numbers of male students and female students.
Mathematics
1 answer:
AVprozaik [17]2 years ago
5 0
X number of male students
Y number of female students
Z number of the adults
X=(1 + 7)Z=8Z
Y= X/2
X +Y +Z = 82
8Z +8Z/2 +Z=82 implies Z=82/26=3.1
so we take Z= 3

X= 24
and Y = 12







You might be interested in
7 times z reduced by a third of the product
ASHA 777 [7]

the answer to 7 times z reduced by a third of the product is 2z

3 0
2 years ago
Read 2 more answers
2 box plots. The number line goes from 175 to 450. For resort A, the whiskers range from 175 to 375, and the box ranges from 250
Maurinko [17]

Answer:its 275 for 1, and 325 for 2

Step-by-step explanation:

i did it

3 0
2 years ago
Read 2 more answers
A local project being analyzed by PERT has 42​ activities, 13 of which are on the critical path. If the estimated time along the
ryzh [129]

Answer:

the probability that the project will be completed in 95 days or​ less, P(x ≤ 95) = 0.023

Step-by-step explanation:

This is a normal probability distribution question.

We'll need to standardize the 95 days to solve this.

The standardized score is the value minus the mean then divided by the standard deviation.

z = (x - xbar)/σ

x = 95 days

xbar = mean = 105 days

σ = standard deviation = √(variance) = √25 = 5

z = (95 - 105)/5 = - 2

To determine the probability that the project will be completed in 95 days or​ less, P(x ≤ 95) = P(z ≤ (-2))

We'll use data from the normal probability table for these probabilities

P(x ≤ 95) = P(z ≤ (-2)) = 0.02275 = 0.023

5 0
2 years ago
Find the sine function that is represented in the graph.
meriva

Answer:

Choice D). f(x)=20\sin(4x) is correct.

Step-by-step explanation:

Given function graph is sinusoidal so let's compare with formula f(x)=A\sin(Bx-C)+D

We know that amplitude is the height from the center line to the peak (or to the trough). From graph we can see that height from the center line to the peak is 20

So amplitude A=20

In that formula, period is given by \frac{2\pi}{B}

From graph we see that period is \frac{\pi}{2}

So both must be equal

\frac{2\pi}{B}=\frac{\pi}{2}

\frac{2}{B}=\frac{1}{2}

cross multiplying them gives

B=4

Clearly there is no shift so C and D are 0

Now plug these values into formula f(x)=A\sin(Bx-C)+D

f(x)=20\sin(4x-0)+0

f(x)=20\sin(4x)

Hence choice D is correct.

6 0
2 years ago
One division of a large defense contractor manufactures telecommunication equipment for the military. This division reports that
Zielflug [23.3K]

Answer:

At the 95% confidence level, management should not conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components, since the upper bound of the confidene interval, which is 0.1339, is higher than 0.12.

Step-by-step explanation:

To reach a conclusion, we have to observe the confidence interval.

Should management conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components?

Is the upper bound of the confidence interval lower than 12% = 0.12?

If yes, it should conclude that this percentage is lower.

Otherwise, it cannot conclude.

Confidence interval:

0.0758 to 0.1339

0.1339 is higher than 0.12.

So.

At the 95% confidence level, management should not conclude that the percentage of rework for electrical components is lower than the rate of 12% for non-electrical components, since the upper bound of the confidene interval, which is 0.1339, is higher than 0.12.

6 0
2 years ago
Read 2 more answers
Other questions:
  • Louis wants to carpet the rectangular floor of his basement the basement has an area of 864 square feet the width of the basemen
    9·1 answer
  • The school librarian recorded the types of books students checked out on a typical day. Suppose there are 605 students enrolled
    10·2 answers
  • a survey asked 50 students if they play an instrument and if they are in band. 25 students play an instrument 20 are in a band a
    14·2 answers
  • Ellen can spend at most $8.25 on snacks for a party. Carrots cost $2 per pack and grapes cost 0.75 per bag. Write a linear inequ
    13·2 answers
  • The density of apple juice is 1.04 grams per cm3. The density of fruit syrup is 1.6 grams per cms The density of sparkling water
    8·1 answer
  • On which of these policies will an insurer pay if there’s a loss
    8·1 answer
  • Quadrilateral CAMP below is a rhombus. the length PQ is (x+2) units, and the length of QA is (3x-14) units. Which statements bes
    15·1 answer
  • Bonus Problem. A craftsman can sell 10 jewelry sets for $500 each. He knows that
    9·1 answer
  • Y varies directly with x, and y is 84 when x is 16. Which equation represents this situation?
    13·2 answers
  • The formula for the velocity of an object is v=d/t, where v is the velocity of an object, dis the distance traveled, and t is th
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!