12

Develop a preliminary work breakdown structure (WBS) for a small one-story commercial building to be constructed on the site of

an existing small-frame structure. It is 30 by 60 ft in plan (see illustration). The exterior and interior walls are of concrete block. The roof is constructed of bar joists covered with a steel roof deck, rigid insulation, and built-up roofing. The ceiling is pended acoustical tile. The floor is a concrete slab on grade with an asphalt tile finish. Interior finish on all walls is paint. a) Show the first level of this structure for the total project (WBS is developed from top to the bottom). b) Select one work package (or building system) of the first level and develop the second- level structure for this work package. Heat and mechanical Lavatory Storage

Engineering
2 answers:
Zielflug [23.3K]2 years ago
6 0

Answer:

The preliminary work breakdown structure will be divided into two steps, the first is to draw the first level and the second is to draw the second level.

Explanation:

Please look at attachment.

ankoles [38]2 years ago
6 0

Answer:

Answer is explained below.

Explanation:

Draw the first level of preliminary WBS for building the small one story commercial building as shown below.

See image 1

Site preparation:

It involves the demolition or cureacking of buildings and other structures clearing of building sites and sale of materials from demolished strictures.

Mechanical System:

It is a system with moving parts. anything with moving parts can be considered as mechanical system.

Building Walls:

Wall is a structure that defines an area, carries load, provide shelter , sound proofing or is decorative.

Electrical system:

Electrical system are a group of electrical components connected to carry out some operation . often-the system are combined with other systems.

B) Draw the second level WBS system as shown below.

See image 2

Plumbing:

It is a system that provides fluid for a wide range of applications . plumbing uses pipes, valves, tanks and other apparatus to carry fluids.

Air heating System:

This can be made cost effective by combining with ventilation system.

Water Heating:

It is a heat transfer process that uses an energy source to heat water above its initial temperature.

Air conditioning:

Air conditioning is the process of removing heat and moisture from the interior of and occupied space to improve the comfort of residents.

Ventilation system:

It is intentional introduction of outside air into space and is mainly used to control indoor air quality by by diluting and displacing indoor pollutants.

You might be interested in
Write multiple if statements: If carYear is before 1967, print "Probably has few safety features." (without quotes). If after 19
Free_Kalibri [48]

Answer:

The solution code is written in Python 3.

  1. carYear = 1995
  2. if(carYear < 1967):
  3.    print("Probably has few safety features.\n")
  4. if(carYear > 1970):
  5.    print("Probably has head rests. \n")
  6. if(carYear > 1991):
  7.    print("Probably has electronic stability control.\n")
  8. if(carYear > 2002):
  9.    print("Probably has airbags. \n")

Explanation:

Firstly, create a variable, <em>carYear</em> to hold the value of year of the car make. (Line 1)

Next, create multiple if statements as required by the question (Line 3-13). The operator "<" denotes "smaller" and therefore <em>carYear < 1967</em> means any year before 1967. On another hand, the operator ">" denotes "bigger" and therefore <em>carYear > 1970 </em>means any year after 1970.

The print statement in each of the if statements is done using the Python built-in function <em>print()</em>. The "\n" is an escape sequence that create a new line at the end of each printed phrase.

5 0
2 years ago
13–27. The conveyor belt is moving downward at 4 m&gt;s. If the coefficient of static friction between the conveyor and the 15-k
Feliz [49]

Answer:

See explanation for step by step procedure to get answer.

Explanation:

Given that:

The conveyor belt is moving downward at 4 m>s. If the coefficient of static friction between the conveyor and the 15-kg package B is ms = 0.8, determine the shortest time the belt can stop so that the package does not slide on the belt.

See the attachments for complete steps to get answer.

4 0
2 years ago
A certain printer requires that all of the following conditions be satisfied before it will send a HIGH to la microprocessor ack
Elza [17]

Answer:

D) AND gate.

Explanation:

Given that:

A certain printer requires that all of the following conditions be satisfied before it will send a HIGH to la microprocessor acknowledging that it is ready to print

These conditions are:

1. The printer's electronic circuits must be energized.

2. Paper must be loaded and ready to advance.

3. The printer must be "on line" with the microprocessor.

Now; if these conditions are met  the logic gate produces a HIGH output indicating readiness to print.

The objective here is to determine the basic logic gate used in this circuit.

Now;

For NOR gate;

NOR gate gives HIGH only when all the inputs are low. but the question states it that "a HIGH is generated and applied to a 3-input logic gate". This already falsify NOR gate to be the right answer.

For NOT gate.

NOT gate operates with only one input and one output device but here; we are dealing with 3-input logic gate.

Similarly, OR gate gives output as a high if any one of the input signals is high but we need "a HIGH that is generated and applied to a 3-input logic gate".

Finally, AND gate output is HIGH only when all the input signal is HIGH and vice versa, i.e AND gate output is LOW only when all the input signal is LOW. So AND gate satisfies the given criteria that; all the three conditions must be true for the final signal to be HIGH.

3 0
2 years ago
If you have power steering and you are able to __________, you should have your vehicle checked out by a qualified technician.
svp [43]

Answer: drive

Explanation:

The best word that would fit this sentence is drive. A vehicle owner should know how to drive, and they can get their vehicle checked by a qualified technician. The best word that would fit this sentence is drive. If you have power steering and you are able to <u>drive</u>, you should have your vehicle checked by a qualified technician.

8 0
2 years ago
A steam power plant operates on the reheat Rankine cycle. Steam enters the highpressure turbine at 12.5 MPa and 550°C at a rate
gayaneshka [121]

Answer:

A) condenser pressure = 9.73 kPa,

B) 10242 kw

C) 36.9%

Explanation:

given data

entrance pressure of steam = 12.5 MPa

temperature of steam = 550⁰c

flow rate of steam = 7.7 kg/s

outer pressure = 2 MPa

reheated steam temperature = 450⁰c

isentropic efficiency of turbine( nt ) = 85% = 0.85

isentropic efficiency of pump = 90% = 0.90

From steam tables

at 12.5 MPa and 550⁰c ; h3 = 3476.5 kJ/kg,  S3 = 6.6317 kJ/kgK

also for an Isentropic expansion

S4s = S3 .

therefore when S4s = 6.6317 kJ/kg and P4 = 2 MPa

h4s = 2948.1 kJ/kg

nt = 0.85

nt (0.85) = \frac{h3-h4}{h3-h4s} = \frac{3476.5 - h4}{3476.5 - 2948.1}

making h4 subject of the equation

h4 = 3476.5 - 0.85 (3476.5 - 2948.1)

h4 = 3027.3 kj/kg

at P5 = 2 MPa and T5 = 450⁰c

h5 = 3358.2 kj/kg,  s5 = 7.2815 kj/kgk

at P6 , x6 = 0.95  and s5 = s6

using nt = 0.85 we can calculate for h6 and h6s

from the chart attached below we can see that

p6 = 9.73 kPa, h6 = 2463.3 kj/kg

B) the net power output

solution is attached below

c) thermal efficiency

thermal efficiency = 1 - \frac{qout}{qin} = 1 - ( 2273.7/ 3603.8) = 36.9% ≈ 37%

8 0
2 years ago
Other questions:
  • At a certain college, 30% of the students major in engineering, 20% play club sports, and 10% both major in engineering and play
    14·1 answer
  • Define a function pyramid_volume with parameters base_length, base_width, and pyramid_height, that returns the volume of a pyram
    10·1 answer
  • A curve in a speed track has a radius of 1000 ft and a rated speed of 120 mi/h. (From Sample Prob. 12.7 is the definition of rat
    10·1 answer
  • The velocity of a particle which moves along the s-axis is given by v = 2-4t+5t^(3/2), where t is in seconds and v is in meters
    11·2 answers
  • Can crushers help us recycle in a space efficient way which is good for saving the earth and for giving you more room in your ap
    7·1 answer
  • Consider a steady developing laminar flow of water in a constant-diameter horizontal discharge pipe attached to a tank. The flui
    14·1 answer
  • What is the linear distance traveled in one revolution of a 36-inch wheel
    6·1 answer
  • Question 14<br> Which of these is true of a spray wash cabinet?
    6·1 answer
  • What are some goals of NYFEA? Select three options.
    9·2 answers
  • Use the drop -down menus to select the appropriate question type. Picking between two possible alternatives: Showing an understa
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!