Answer:
Order size= $57.61 per machine hour
Explanation:
Giving the following information:
Order size:
Estimated total overhead= $581,866
Estimated total machine hours= 10,100
<u>To calculate the predetermined manufacturing overhead rate we need to use the following formula:</u>
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Order size= 581,866 / 10,100
Order size= $57.61 per machine hour
Answer:
If a foreign government hires an American consulting firm to help the country's textile industry improve production operations, the contract is commercial, and if the foreign government refuses to pay, the consulting firm may sue the government in American courts.
False
Explanation:
Any company could be sued at anywhere so far there is bridge of agreement or contract, with the analogy above such consulting American company would be sued but in the above case, a consulting American firm can not sue themselves unless someone in the company sue the American consulting firm
Answer and Explanation:
According to the scenario, computation of the given data are as follow:-
Price ceiling:-This is show the limit of the price on maximizing value of the product which is decided by government and his imposed group for customer.
Binding:-The binding price ceiling is below the equilibrium price.
Unbinding:-The unbinding price ceiling is above equilibrium price.
Price floor:-This is show the limit of the price on lower value of the product which is decided by government and his imposed group for customer. A price floor must be higher than the price equilibrium price in order to be effective.
Binding:-The binding price floor is above the equilibrium price.
Unbinding:-The unbinding price floor is below the equilibrium price.
It is given that the equilibrium price of milk is $2.50 per gallon.
Statement 1:-This is the example of price floor and binding because minimum price of $2.30 per gallon is decided.
Statement 2:-This is the example of price floor and binding because minimum price of $3.40 per gallon is decided for gasoline.
Statement 3:-This is the example of price floor and binding because teenagers are not hired due to minimum-wage laws.
Answer:
The answer is:
Asset will be overstated
Net income will be overstated
Explanation:
Because of the incorrect capitalization(the process of converting or adding to a firm's asset):
1. Assets are overstated. Assets that shouldn't are added to the entire assets are added. So it's increasing the company's asset whereas it's not.
2. Net income are overstated. Because depreciation too will have to be charged for the asset that wasn't there, therefore, net asset will be overstated.
Answer:
B. Grouting
Explanation:
These are the options for the question;
A. Epoxy resin
B. Grouting
C. Tensioning
D. Ranging
In the case of dormant cracks wider than about 1m, it is more economical to use grouting method.
Grouting techniques is a techniques that is achieved by removal of dirt or unwanted substance from the crack of the the faulty part and then grouting of the crack after which the surface is sealed by sealants. It should be noted that grouting is economical than other methods such as surface treatment.