- The rate of the hose with the large diameter is:
Answer: A). 1/9.
- What is the unknown in the problem?
Answer: C). the time it takes for the hoses working together to fill the pool
-What part of the job does the hose with the large diameter do?
Answer: B). x/9
Answer:
Step-by-step explanation:
slope=change in y/change in x
one way is t pick 2 points, (x1,y1) and (x2,y2)
the slope is (y2-y1)/(x2-x1)
pick some points
(8,4) and (8,0)
slope=(0-4)/(8-8)=-4/0=undefined
the slope is undefined
there is no slope.
Answer:
It has millions of tickets. On each ticket is written a number a dollar amount. The exact average and SD are unknown but are estimated from the sample to be $20,000 and $5,000 respectively.
Step-by-step explanation:
Given that:
sample size n = 1600
sample mean
= 20000
standard deviation = 5000
The objective is to choose from the given option about what most closely resembles the relevant box model.
The correct answer is:
It has millions of tickets. On each ticket is written a number a dollar amount. The exact average and SD are unknown but are estimated from the sample to be $20,000 and $5,000 respectively.
However, if draws are made without replacement, the best estimate of the average amount for the bride will be $20,000
Similarly, the standard error for the sample mean = 


the standard error for the sample mean = 125
m • (g4c - 3)
(1):g4 was replaced by g^4.
Pulling out like terms:
2.1:Pull out like factors:
g4cm - 3m = m • (g4c - 3)
Trying to factor as a Difference of Squares :
2.2:Factoring: g4c - 3
Answer:
3.88
Step-by-step explanation:
y = 23.28/6 x
y = 3.88 x
so, the constant of proportionality is 3.88