answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
ollegr [7]
2 years ago
12

Simplify the numerical expression 5.75 - 1/2 (20÷2.5) ÷ 2+6

Mathematics
1 answer:
svet-max [94.6K]2 years ago
3 0

Answer:

5.75 - 1/2 times 8 divided by 2 + 6

Step-by-step explanation:

You might be interested in
CD is a perpendicular bisector of . Which of the following could be the slopes of the two lines if plotted on a coordinate grid?
NISA [10]

Step-by-step explanation:

A is the correct answer of this question

8 0
2 years ago
g Assume that the distribution of time spent on leisure activities by adults living in household with no young children is norma
OLga [1]

Answer:

"<em>The probability that the amount of time spent on leisure activities per day for a randomly selected adult from the population of interest is less than 6 hours per day</em>" is about 0.8749.

Step-by-step explanation:

We have here a <em>random variable</em> that is <em>normally distributed</em>, namely, <em>the</em> <em>time spent on leisure activities by adults living in a household with no young children</em>.

The normal distribution is determined by <em>two parameters</em>: <em>the population mean,</em> \\ \mu, and <em>the population standard deviation,</em> \\ \sigma. In this case, the variable follows a normal distribution with parameters \\ \mu = 4.5 hours per day and \\ \sigma = 1.3 hours per day.

We can solve this question following the next strategy:

  1. Use the <em>cumulative</em> <em>standard normal distribution</em> to find the probability.
  2. Find the <em>z-score</em> for the <em>raw score</em> given in the question, that is, <em>x</em> = 6 hours per day.
  3. With the <em>z-score </em>at hand, we can find this probability using a table with the values for the <em>cumulative standard normal distribution</em>. This table is called the <em>standard normal table</em>, and it is available on the Internet or in any Statistics books. Of course, we can also find these probabilities using statistics software or spreadsheets.

We use the <em>standard normal distribution </em>because we can "transform" any raw score into <em>standardized values</em>, which represent distances from the population mean in standard deviations units, where a <em>positive value</em> indicates that the value is <em>above</em> the mean and a <em>negative value</em> that the value is <em>below</em> it. A <em>standard normal distribution</em> has \\ \mu = 0 and \\ \sigma = 1.

The formula for the <em>z-scores</em> is as follows

\\ z = \frac{x - \mu}{\sigma} [1]

Solving the question

Using all the previous information and using formula [1], we have

<em>x</em> = 6 hours per day (the raw score).

\\ \mu = 4.5 hours per day.

\\ \sigma = 1.3 hours per day.

Then (without using units)

\\ z = \frac{x - \mu}{\sigma}

\\ z = \frac{6 - 4.5}{1.3}

\\ z = \frac{1.5}{1.3}

\\ z = 1.15384 \approx 1.15

We round the value of <em>z</em> to two decimals since most standard normal tables only have two decimals for z.

We can observe that z = 1.15, and it tells us that the value is 1.15 standard deviations units above the mean.

With this value for <em>z</em>, we can consult the <em>cumulative standard normal table</em>, and for this z = 1.15, we have a cumulative probability of 0.8749. That is, this table gives us P(z<1.15).  

We can describe the procedure of finding this probability in the next way: At the left of the table, we have z = 1.1; we can follow the first line on the table until we find 0.05. With these two values, we can determine the probability obtained above, P(z<1.15) = 0.8749.

Notice that the probability for the z-score, P(z<1.15), of the raw score, P(x<6) are practically the same,  \\ P(z. For an exact probability, we have to use a z-score = 1.15384 (without rounding), that is, \\ P(z. However, the probability is approximated since we have to round z = 1.15384 to z = 1.15 because of the use of the table.

Therefore, "<em>the probability that the amount of time spent on leisure activities per day for a randomly selected adult from the population of interest is less than 6 hours per day</em>" is about 0.8749.

We can see this result in the graphs below. First, for P(x<6) in \\ N(4.5, 1.3) (red area), and second, using the standard normal distribution (\\ N(0, 1)), for P(z<1.15), which corresponds with the blue shaded area.

5 0
2 years ago
Find the value of y for a given value of x, if y varies directly with x.
stepan [7]

Answer:

5.46

Step-by-step explanation:

3.24/5.4 = y/9.1

7 0
2 years ago
the time taken by a student to the university has been shown to be normally distributed with mean of 16 minutes and standard dev
Naya [18.7K]

Answer:

a) 2.84% probability that he is late for his first lecture.

b) 5.112 days

Step-by-step explanation:

When the distribution is normal, we use the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.

In this question, we have that:

\mu = 16, \sigma = 2.1

a. Find the probability that he is late for his first lecture.

This is the probability that he takes more than 20 minutes to walk, which is 1 subtracted by the pvalue of Z when X = 20. So

Z = \frac{X - \mu}{\sigma}

Z = \frac{20 - 16}{2.1}

Z = 1.905

Z = 1.905 has a pvalue of 0.9716

1 - 0.9716 = 0.0284

2.84% probability that he is late for his first lecture.

b. Find the number of days per year he is likely to be late for his first lecture.

Each day, 2.84% probability that he is late for his first lecture.

Out of 180

0.0284*180 = 5.112 days

4 0
2 years ago
Two triangles are similar with a scale factor of 3. The preimage triangle has a base of 7 inches and a height of 10 inches. What
vaieri [72.5K]

Answer:

<u>The area of the larger triangle is 315 inches²</u>

Step-by-step explanation:

1. Let's review all the information provided for answering the questions properly:

Pre-image triangle has a base of 7 inches and a height of 10 inches

Scale used : Factor of 3

2. What is the area of the larger triangle??

For calculating the area of the larger triangle, we use the scale this way:

Base = 7 inches * 3

21 inches

Height = 10 inches * 3

30 inches

Area of the larger triangle = 1/2 (Base * Height)

Area of the larger triangle = 1/2 (21 * 30)

<u>Area of the larger triangle = 630/2 = 315 inches²</u>

6 0
2 years ago
Other questions:
  • Which of the following names the figure in the diagram below?
    13·2 answers
  • The vertex of this parabola is at (-2, -3). When the y-value is -2, the x-value is -5. Determine the coefficient of the squared
    7·1 answer
  • Patrick and Brooklyn are making decisions about their bank accounts. Patrick wants to deposit $300 as a principle amount, with a
    10·2 answers
  • The slope of a line is 2. The y-intercept of the line is –6. Which statements accurately describe how to graph the function?
    9·2 answers
  • Joy recorded the distances she walked each day for five days. How far did she walk in 5 days? Line plot: 3 xs on 1/3 1 x on 1/2
    9·1 answer
  • Maple street is 3 times as long as pine street. how long is pine street?
    9·2 answers
  • Let's say the area of the map is 21
    7·1 answer
  • What is the product of 5.86 × 10–7 and 3.1 × 104 1. Write the expression: (5.86 × 10–7)(3.1 × 104) 2. Rearrange the expression:
    7·2 answers
  • Malik's arts and crafts shop have a bolt of crimson velvet 32 meters long. A customer came in during the morning and bought 120
    11·2 answers
  • Mr. Velasquez built a playground. It has one section with a slide and another section with a swing set. A pathway connects the t
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!