Y = 0.213x – 352.0 <span> represents this linear model shown in the data table.
Plug in the values of x into the equation for a double check.
Let's try 1980.
</span><span>y = 0.213(1980) – 352.0
</span>y = 69.74
which is closest to the 70.1 whereas other options do not satisfy the condition.
Answer:
$6,020,826.711
Step-by-step explanation:
The computation of the present value of that year salary is shown below:
As we know that
Present value in case of continuous compounding, the formula is

where,
The Guaranteed amount is $9,000,000
The Time period is 6 years
And, the interest rate is 6.7%
Now placing these values
So, the present value is

= $6,020,826.711
Answer:
<h3>The correct expression is 1 Over 5 x Superscript minus 8 Baseline y Superscript minus 13 Baseline EndFraction</h3>
Step-by-step explanation:
Given the expression
for x ≠ 0, y ≠ 0 to get the equivalent expression we will have to simplify the given expression.

The correct expression is 1 Over 5 x Superscript minus 8 Baseline y Superscript minus 13 Baseline EndFraction
Answer: 60 kilometers
If the average speed for the trip of 80 kilometers per hour, and the time of the trip was 45 minutes, then the distance between the two jungles is 60 kilometers.
45 minutes is three-quarters of an hour, or 0.75. I multiplied this decimal by 80 to get 60, the distance between Jungle A and Jungle B.
Answer:
m = -1/2 and b = 6.5
Step-by-step explanation:
To find the slope of the original line segment, we have to do the change in y/the change in x:
(4-8)/(-5--3) = -4/-2 = 2
2 is the slope of the original line segment, but since this is the perpendicular bisector, we have to take the negative reciprocal of 2 so m = -1/2
To find b we substitute the values of x, y, and m into the equation. Let's use the x value of -3 and the y value of 8:
y = mx + b
8 = -1/2(-3) + b
8 = 3/2 + b
6.5 = b