Answer:
a box plot
Step-by-step explanation:
Given the number of employees at her company is 685
If she chooses to create a dot plot, it means that she need to draw a lot, the total number of dots is 685 and even a wide domain of the number of data values on the x-axis.
If she chooses the box lot, which means that she wants to displays the five-number summary of a set of data. The five-number summary is the minimum, first quartile, median, third quartile, and maximum.
=> So it is the best fit for her choice.
If she chooses histogram, it means that she wants to group numbers into ranges to identify the underlying frequency distribution (shape) of a set of continuous data
Hope it will find you well
Answer:
0.07
a. the distribution will be a normal distribution.
c. we would suspicious ins there is a 2 % chance of getting the required value.
Step-by-step explanation:
Let the number of times, t be = 50
Assuming that the die is fair
standard deviation = 1.71
mean = 3.5
suppose we want tp find the probability of a 2 showing. The solution becomes:
probability = 
c. the mean of rolls will be 0.07
With
a standard deviation of 6 minutes, we will test the hypothesis that σ = 6
against the alternative that σ < 6 if a random sample of the test
times of 20 high school seniors has a standard deviation s = 4.51. use a
0.05 level of significance.
<span /><span><span>
</span></span>
A group of customer service surveys were sent out at random. The scores were 90, 50, 70, 80, 70, 60, 20, 30, 80, 90, and 20. Fin
egoroff_w [7]
Answer:
60
Step-by-step explanation:
To find the mean, add all numbers together and divide by the amount of numbers.
Total of number = 660
Number of numbers = 11
660/11 = 60
Answer:
answered
Step-by-step explanation:
A)lean
B)lean
C)traditional
In Lean manufacturing system works are done reduce inventory levels below what would be found in a traditional manufacturing system. The company does so by reducing batches into smaller batch sizes rather than large batch sizes. Goods are produced through product cells rather than departments.
Within-batch wait time is time that product waits in a product cell for the other products in a batch, it is calculated by multiplying the value-added time per unit by number of other products ,one less the total batch size