answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
vovikov84 [41]
2 years ago
12

What is 55/99 rounded to the nearest half

Mathematics
1 answer:
N76 [4]2 years ago
4 0

Answer:1/2

Step-by-step explanation:

You might be interested in
The sixth grade art students are making a mosaic using tiles in the shape of right triangles. Each tile has leg measures of 3 ce
d1i1m1o1n [39]
Area of a Triangle = 0.5 x Base x Height 
 
Therefore the area of one mosaic triangle = 0.5 x 3 x 5 = 7.5

So the area of the whole mosaic is : 7.5 x 200 = 1500cm^2 
8 0
2 years ago
An internet service provider charges $18 per month plus an initial set up fee. one customer paid a total of $81 after 2 months o
frosja888 [35]
Ok so
cost=setupfee+costused
costused=(number of months) times (cost per month)
if we represent number of months as x
we know cost per month is 18
18x is costused
 and in 2 m onts, he paid 81 so
81=startup fee +18x
2 monts so x=2
81=startupfeee+36
subtract 36
45=startup fee

5 monts is x=5
45+18(5)=45+90=135


A. cost=18x+45
B. $45
C. $135
6 0
2 years ago
There are four activities on the critical path, and they have standard deviations of 1, 2, 4, and 2. what is the probability tha
Anit [1.1K]

Standard deviations of the four activities of the critical path are 1,2,4,2.

Standard deviation of this critical path = Sum of square root of variance of this corresponding critical path

Standard deviation of critical path =\sqrt{1^2+2^2+4^2+2^2}

=\sqrt{1+4+16+4}

=\sqrt{25}

=5

Now we need to find the probability that the project will completed in 38 weeks given that its expected completion time is 40 weeks.

That is, we need to find P(X<38) :

z=\frac{38-40}{5}= \frac{-2}{5}=-0.4

P(X

Probability =0.5-0.16=0.34

Thus the probability that the project will be completed in 38 weeks is 0.34.

8 0
2 years ago
Read 2 more answers
The picture below shows a box sliding down a ramp:
Gennadij [26K]

Answer:

AC=15.1\ ft

Step-by-step explanation:

we know that

In the right triangle ABC

The function sine of angle 68 degrees is equal to divide the opposite side SB by the hypotenuse AC

so

sin(68\°)=\frac{AB}{AC}

substitute the values and solve for AC

sin(68\°)=\frac{14}{AC}

AC=\frac{14}{sin(68\°)}

AC=15.1\ ft

4 0
2 years ago
Stacey owns a lot that has 180 feet of front footage and contains 36,000 square feet. She purchases two lots adjacent to each si
bija089 [108]
The graph of the function f(x)=(x+2)(x+6) is shown

The statement the function is negative for all real values of x where x <-2
3 0
2 years ago
Read 2 more answers
Other questions:
  • A building across the street casts a shadow that is 24 feet long. Your friend is 6 feet tall and casts a shadow that is 4 feet l
    8·2 answers
  • Sketch the region bounded by the curves y=3x3, x+y=4, and y=0. Find the coordinates of the centroid.
    11·1 answer
  • A segment has endpoints A (-1, 1) and B (8, 4) . If the segment is divided into four equal parts, the coordinates of the point c
    7·2 answers
  • Ty had 10 eggs. He made 4 servings of scrambled eggs. He used n eggs for each serving.
    10·1 answer
  • Which recursive formula can be used to generate the sequence below, where f(1) = 3 and n ≥ 1?
    12·2 answers
  • What fraction is equal to75% of 1/2
    9·2 answers
  • Miguel’s employer pays $1,825 in health insurance and $93 in life insurance per year. He also gets $2,860 in paid time off per y
    12·2 answers
  • Write a verbal expression for 4m2+2
    12·2 answers
  • A manufacturer of cordless electric shavers sampled 13 from a​ day's production and found the mean time of continuous usage with
    10·1 answer
  • Which graph represents a function with direct variation?
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!