The little lines in each side show that the sides are the same length but you also need to find the length of the smaller side which isn’t the same. For this imagine that the shape is split into a square and a triangle and you need to find the long side of the triangle using Pythagoras
a^2 + b^2 = c^2
20^2 + 20^2 = 800
Square root of 800 = 28.3
Then do 28.3-20=8.3
So I think the answer is 20+20+20+20+20+8.3=108.3 cm
Whenever you're asked to find the best prediction based on the graph, you always use the line of best fit (the black line) that is determined from your data points.
Since 202cm isn't on your graph, you will need to write an equation for your line of best fit and mathematically figure out the arm span. If you look at your graph, notice that for every x value, the y value is equal to it. That makes writing the equation easy. Since x=y, your equation is pretty much just y = x.
Your x value that you need to plug in is x=202cm. This is because height is on the x axis and the height you want to find the arm span for is 202cm. Plug x=202 into the equation:
y=x
y=202
The arm span <span>of a player that is 202 cm tall is B) 202cm wide.</span>
The 5 is represented as 50. The number is in the tens place, and 5 in the tens place means 50.
LIST has 5 lines: L has two, I has 1, T as 2. It has one curve: S.
Therefore LIST = 51
LOAD has 6 lines, 2 curves.
L has 2 lines, A has 3 lines, D has one line (also one curve)
O is one curve, D has one, so LOAD= 62
Answer:
Direct labor cost= $1,500,000
Step-by-step explanation:
Giving the following information:
Production:
September 50,000
Each sneaker requires 2 hours of direct labor time.
Direct labor wages average $15 per hour.
<u>First, we need to calculate the number of direct labor hours required:</u>
Direct labor hours= 50,000*2= 100,000 hours
<u></u>
<u>Now, the direct labor cost:</u>
Direct labor cost= 100,000*15= $1,500,000