nmmn,.Answer:
mn,./.,m.mn,.mn,lm
Step-by-step explanation:
lk;lkjhgbnm,jnhgfhjnmjkhgfdedrftgyhjkljhugyft
Answer:
c
Step-by-step explanation:
Answer: high test-retest reliability
Step-by-step explanation: this is because the result of the survey was thesame with the previous result, despite the space of time between when the first survey was conducted and when the second survey was conducted. There was know observable difference in result and if conducted in the next 3 months again, it will give same result, this strongly indicate that the survey has high test-retest reliability.
Answer:
17, 18, 19, 20, 21
Step-by-step explanation:
As a general rule to solve the problem we are going to transform all values to the lower unit.
a. 3 km 9 hm 9 dam 19 m + 7 km 7 dam
3,000 m 900 m 90 m 19 m + 7,000 m 70 m = 4,009 + 7,070 = 11,079 m
b. 5 sq.km 95 ha 8,994 sq.m + 11 sq. km. 11 ha 9,010 sq. m.
5,000,000 sq m 95,0000 sq m 8,994 sq m + 11,000,000 sq m 110,000 sq
9,010 sq m
5,103,994 sq m + 11,119,010 sq m = 16,223,004 sq m
c. 44 m – 5 dm
44 m - 0.5 m = 43.5 m
d. 73 km 47 hm 2 dam - 11 km 55 hm
73,000 m 4,700 m 20 m - 11,000 m 5,500 m
77,720 m - 16,500 m = 61,220 m