Answer:
d) Changes in working capital
Explanation:
the formula used for calculating net PP&E is:
Net PP&E = gross PP&E + capital expenditures - accumulated depreciation
PP&E represents fixed assets (plant, property, and equipment).
On the other hand, working capital involves current assets and liabilities such as cash, accounts receivables, accounts payable, inventories, taxes payable, etc.
Answer:
Other Engineers.
Explanation:
Richard, an architect, directs the construction of a new highway along the mountainside. When the bridge collapses owing to poor grading in a flood, Richard is charged in the accident by pedestrians and hikers. Richard as a specialist is treated the same way of service as Other Engineers.
Richard has to ensure all safety and the mandatory scientific method to make a strong roadside and try to save herself as other professionals do.
Answer:
B, net income for the year was $1,200,000, average assets were $20 million, ROI was 6%
Explanation:
net income is calculated by multiplying the percentage margin by the sales. We have,
(2 ÷ 100) × $60,000,000
= 0.02 × $60,000,000
= $1,200,000
To calculate the average assets, sales is divided by the turnover.
we have, ($60,000,000 ÷ 3.0)
= $20,000,000.
To calculate the ROI, margin and turnover are multiplied.
we have,
(2% × 3.0) = 6%
Cheers.
Answer:
debit for 50,779
Explanation:
the actual overhead will be debited which is composed by the actual cost associate with the production department which aren't direct materials or labor.
property taxes 10,000
injury insurance 8,400
building insurance 3,820
utilities 1,306
equipment dep 12,680
building dep 14,573
actual overhead 50,779
Answer:
Explanation:
Experiments were performed for 240 people, 60 people test positive.
Step 1: we calculate the sample proportion; p= 60/240= 0.25.
Step 2: calculate the standard error for the sample, which is the square root of sample proportion,p = p(1-p)/n, n=100
0.25(1-0.25)/100
= 0.04.
Step 3: calculate the test statistics; assuming the hypothesis test percentage is 25%
Then, we say 0.25-1=0.75
-0.75/0.04
= -1.875.
In particular, the sample results are -1.875 standard error.
Probability of Z is less than -1.875.
Look up it value in the Z table