answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Zielflug [23.3K]
1 year ago
6

1.32 Factory defective rate. A factory quality control manager decides to investigate the percentage of defective items produced

each day. Within a given work week (Monday through Friday) the percentage of defective items produced was 2%, 1.4%, 4%, 3%, 2.2%. (a) Calculate the mean for these data. (b) Calculate the standard deviation for these data, showing each step in detail.
Mathematics
1 answer:
USPshnik [31]1 year ago
4 0

Answer:

a) the mean percentage of defective item produced is 2.52 %

b) the standard deviation of percentage of defective item produced is 1.01%

       

Step-by-step explanation:

Given that;

the percentage of defective items produced was 2%, 1.4%, 4%, 3%, 2.2%.

sample size n = 5

a) Calculate the mean for these data

mean percentage of defective item produced will be;

x^{bar} = ∑x / n

x^{bar} = ∑x / n = ( 2% + 1.4% + 4% + 3% + 2.2% ) / 5

x^{bar}  = 12.6 / 5

x^{bar}  = 2.52 %

Therefore, the mean percentage of defective item produced is 2.52 %

b) Calculate the standard deviation for these data

Formula for standard deviation is;

S = √( (∑(x-x^{bar} )²) / (n-1) )

so we make a table;

x                   ( x - x^{bar} )%                ( x - x^{bar} )²%

2%                 -0.52                         0.2704

1.4%               -1.12                           1.2544

4%                  1.48                          2.1904  

3%                  0.48                         0.2304

2.2%.             -0.32                         0.1024

summation                                     4.048

so (∑(x-x^{bar} )² = 4.048%  

so we substitute the value into our equation;

S = √( (∑(x-x^{bar} )²) / (n-1) )

S = √( (4.048%) / (5-1) )

S = √( 4.048% / 4 )

S = √( 1.0121

S =  1.00598 % ≈ 1.01%

Therefore, the standard deviation of percentage of defective item produced is 1.01%

You might be interested in
Jala put $600 in an interest bearing account with a annual compound interest rate of 5%. Jala determined that after seven years,
Arturiano [62]
The answer is 14.4 years
7 0
1 year ago
Read 2 more answers
A cell doubles every 15 minutes. If there is 1 cell at noon, how many cells will there be at 3 p.m.? Show work.
Alik [6]
12:15 - 1+1 = 2
12:30 - 2 + 2 = 4
12:45 - 4 + 4 = 8
1 - 8 +8 = 16
1:15.......
.......
3 - 4096
4 0
1 year ago
Read 2 more answers
What is the slope of the line shown?<br> a -7/9 <br> b 9/7 <br> c 7/9 <br> d -9/7
max2010maxim [7]
Slope = y2 - y1/x2 - x1
6 - -3/1 - -6
=9/7
7 0
2 years ago
Help! Find the coordinates of P so that P partitions the segment AB in the ratio 6:2 if A(−4,12) and B(9,−4).
LekaFEV [45]

(5.75,0)

Let A be (x1,y1) , B be (x2,y2) , P be (x,y) and the ratio be m:n

Formula is,

x=(x2*m+x1*n)/(m+n)

y=(y2*m+y1*n)/(m+n)

7 0
1 year ago
A local project being analyzed by PERT has 42​ activities, 13 of which are on the critical path. If the estimated time along the
ryzh [129]

Answer:

the probability that the project will be completed in 95 days or​ less, P(x ≤ 95) = 0.023

Step-by-step explanation:

This is a normal probability distribution question.

We'll need to standardize the 95 days to solve this.

The standardized score is the value minus the mean then divided by the standard deviation.

z = (x - xbar)/σ

x = 95 days

xbar = mean = 105 days

σ = standard deviation = √(variance) = √25 = 5

z = (95 - 105)/5 = - 2

To determine the probability that the project will be completed in 95 days or​ less, P(x ≤ 95) = P(z ≤ (-2))

We'll use data from the normal probability table for these probabilities

P(x ≤ 95) = P(z ≤ (-2)) = 0.02275 = 0.023

5 0
1 year ago
Other questions:
  • Tina went to the hardware store to buy a door knob and a towel bar, and while she was in the checkout line, she also threw some
    11·2 answers
  • Juanita and Samuel are planning a pizza party. They order a rectangle sheet pizza that measures 21 inches by 36 inches.?They tel
    11·1 answer
  • A board game is played as follows: a number cube numbered 1 to 6 is rolled. If the number 1 comes up, you get nothing. If the nu
    12·2 answers
  • Concentric circles are circles with the same center but different radii. Which equations represent concentric circles along with
    13·2 answers
  • David read 69 books in a 12-month period. Sarah read 54 books in the same period of time. How many more books per month did Davi
    10·2 answers
  • In a GP if T3 = 18 and T6 = 486 Find:- T10
    13·2 answers
  • An online furniture store sells chairs for $200 each and tables for $600 each. Every day, the store can ship a maximum of 32 pie
    11·1 answer
  • An open rectangular box with a square bottom must have a surface area of a square inches. Write a formula for the volume of the
    13·1 answer
  • -3 \cdot f(-8) + 7 \cdot g(2) =−3⋅f(−8)+7⋅g(2)=minus, 3, dot, f, left parenthesis, minus, 8, right parenthesis, plus, 7, dot, g,
    7·1 answer
  • Find the nth term of this sequences<br> 20,18,16,14
    12·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!