Answer:
The decimal value of 101₂² base 2 = 25 base 10
Explanation:
The number 101₂² in decimal value is found as follows;
101₂ × 101₂ = 101₂ + 0₂ + 10100₂
We note that in 101 + 10100 the resultant 2 in the hundred position will have to be converted to a zero while carrying over 1 to the thousand position to give;
101₂ + 0₂ + 10100₂ = 11001₂
Therefore;
101₂² = 11001₂
We now convert the result of the square of the base 2 number, 101², which is 11001₂ to base 10 as follows;
Therefore converting 11001₂ to base 10 gives;
11001₂= 1 × 2⁴ + 1 × 2³ + 0 × 2² + 0 × 2 ¹ + 1 × 2⁰
Which gives;
16 + 8 + 0 + 0 + 1 = 25₁₀.
Answer:
Search for something that fits her needs
Explanation:
There are several approaches to problem solving, the approach that will be employed depends on our definition of the problem. Not all processes can be modeled by mathematical equations, some processes are simply theoretical and can be explained by simple logic.
If Allison does not find the needed equations among the available default equations, she can come up with an equation that addresses the process at hand. If she cannot come up with any, she can use other approaches that fit her needs to explain the required concept to the team.
First, we have to understand what scope is. When variables are declared, they are only available in the code block they're declared in, unless they're global variables (this doesn't apply here).
strFirst is declared in usernameMaker and that is the only place it is available in.
I think select the video insert select the movie option under illustrations resize the video player then select the insert tab i’m not 100 percent sure tho
The best option that will suite is that there will be no major issues since the offshore leads and the onsite members participated in the demo with the Product Owner/Stakeholders they can cascade the feedback to the offshore members
Explanation:
Iteration demo is the review which is done to gather the immediate feedback from the stakeholders on a regular basis from the regular cadence. This demo will be one mainly to review the progress of the team and the and to cascade and show their working process
They show their working process to the owners and they and the other stakeholders and they get their review from them and so there will be no issues if the members are not able to participate