We are asked to solve for:
P (sand | positive)
So, we solve this by:
P (sand | positive) = P (sand) x P (positive for sand)
P (sand | positive) = 0.26 (0.75)
P (sand | positive) = 0.195
The probability is 0.195 or 19.5%.
Answer:
StartFraction 7 over 2 EndFraction can be used to find the unit rate if one divides 7 by 2 and compares the result to 1
Step-by-step explanation:
we know that
The formula to calculate the slope between two points is equal to

we have the points
B(2, 7) and D(4, 14)
substitute the values


The unit rate is

therefore
StartFraction 7 over 2 EndFraction can be used to find the unit rate if one divides 7 by 2 and compares the result to 1
Answer:
a. 0.50
Step-by-step explanation:
The standard error of the mean is the standard deviation of the population divided by the square root of the sample size.
In this problem, we have that:
Standard deviation of the population: 6 hours
Sample size: 144
Square root of 144 is 12.
So the standard error of the sample mean is 6/12 = 0.5.
Answer:
2.2 minutes
Step-by-step explanation:
38.5 ÷ 17.5 = 2.2