Answer:
a) 2/42
b)16/42
Step-by-step explanation:
a) 2/7 x 1/6 = 2/42
b) (1,2) (1,3) (2,3)
P(1,2) = 2/7 x 3/6 = 6/42
P(1,3) = 2/7 x 2/6 = 4/42
P(2,3) = 3/7 x 2/6 = 6/42
Add all = 6/42 + 4/42 + 6/42 = 16/42
The manager could perform scalar multiplication on Matrix A, using the scalar 1.15.
Increasing the price by 15% would mean we are taking 100% of the value + another 15%; 100+15 = 115%; 115% = 115/100 = 1.15.
Multiplying every value in Matrix A by 1.15 will give the price raised by 15%.
Alright, lets get started.
If Matthew wants to complete packages at an average rate of at least 39 packages per hour.
And they worked 4 hrs only due to picnic, yesterday, it means they have to make
packages.
But they made only 112 packages means they are short of
packages.
Suppose they are working today t hrs, and his department will complete 43 packages per hour today.
It means they are going to make 43 t packages today.
This 43 t packages includes those 44 too , which they are short of yesterday due to picnic.
So, average will be
(39 average given in question)
Cross multiplying

Adding 44 in both sides


Subtracting 39 t in both sides


Dividing 4 in both sides
t = 11 hrs
Hence they have to woth 11 hrs today : Answer
Hope it will help :)
Answer:
The number line is missing, but as we are know that the number marked in the number line is -6/4, i will guess that the ticks are spearated by fourts (the distance between each tick is 1/4).
Now, for the number at the right of -6/4, we should add the distance for one tick, this means that the number at the right is:
-6/4 + 1/4 = -5/4.
Now i will give some other examples:
Now, if the distance between ticks is 2/4, then the number at the right will be:
-6/4 + 2/4 = -4/4 = -1
Now, if the distance between ticks is 3/4, the the number at the right will be:
-6/4 + 3/4 = -3/4.