answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Debora [2.8K]
2 years ago
12

we studied FIFO, Priority, Round Robin (RR), and Weighted Fair Queueing (WFQ) packet scheduling disciplines. Which of these queu

eing disciplines ensure that all packets depart in the order in which they arrived?
Computers and Technology
1 answer:
Marrrta [24]2 years ago
6 0

FIFO stands for First In First Out. In this type of handling approach the oldest (first) entry, or 'head' of the queue, is processed first.

Round Robin assigns time slices to each process in equal portions and in circular order and there is no priority in the processes,

FIFO is the one that ensures that all packets depart in the order in which they arrived.

You might be interested in
Convert the following numbers to binary numbers: 5 , 6 , 7 , 8 , 9 .​
Anon25 [30]

Answer:

log 5,6,7,8,9 is the binary number according to the computer

7 0
2 years ago
Read 2 more answers
How do i use autofill to fill the range A9:H11 with the formatting from the range A7:H8
myrzilka [38]

Answer:

See the explanation below

Explanation:

An image showing the range of cells is attached.

The task is to use autofill to fill the range of A9:H11 with the formatting from the range of A7:H8;

As shown in the image some cells are already filled. First, we highlight the cells A7:H8 and then we move the cursor to the end of the selected cell (precisely end of H8) over what is called Fill Handle and the cursor then turns into a black plus sign.

Hold down the right mouse button and drag over the wanted range of cells (A9:H11) and release.

A list of options is presented, this options include:

Copy cells, Fill series, Fill formatting only, Fill without formatting and so on.

From the displayed options, we select "Fill formatting only" and the cell (A9:H11) will have the same formatting as the cells (A7:H8).

3 0
2 years ago
HELP 30 points and Brainliest.Type the correct answer in the box. Spell all words correctly.
maria [59]

Answer:

engineering

Explanation:

8 0
2 years ago
Compare the elements of the basic Software Development Life Cycle with 2 other models. How are they similar? How are they differ
Artemon [7]

Answer:

Explanation:

One of the basic notions of the software development process is SDLC models which stands for Software Development Life Cycle models. SDLC – is a continuous process, which starts from the moment, when it’s made a decision to launch the project, and it ends at the moment of its full remove from the exploitation. There is no one single SDLC model. They are divided into main groups, each with its features and weaknesses. The most used, popular and important SDLC models are given below:

1. Waterfall model

2. Iterative model

3. Spiral model

4. V-shaped model

5. Agile model

Stage 1. Planning and requirement analysis

Each software development life cycle model starts with the analysis, in which the stakeholders of the process discuss the requirements for the final product.

Stage 2. Designing project architecture

At the second phase of the software development life cycle, the developers are actually designing the architecture. All the different technical questions that may appear on this stage are discussed by all the stakeholders, including the customer.  

Stage 3. Development and programming

After the requirements approved, the process goes to the next stage – actual development. Programmers start here with the source code writing while keeping in mind previously defined requirements. The programming by itself assumes four stages

• Algorithm development

• Source code writing

• Compilation

• Testing and debugging

Stage 4. Testing

The testing phase includes the debugging process. All the code flaws missed during the development are detected here, documented, and passed back to the developers to fix.  

Stage 5. Deployment

When the program is finalized and has no critical issues – it is time to launch it for the end users.  

SDLC MODELS

Waterfall – is a cascade SDLC model, in which development process looks like the flow, moving step by step through the phases of analysis, projecting, realization, testing, implementation, and support. This SDLC model includes gradual execution of every stage completely. This process is strictly documented and predefined with features expected to every phase of this software development life cycle model.

ADVANTAGES  

Simple to use and understand

DISADVANTAGES

The software is ready only after the last stage is over

ADVANTAGES

Management simplicity thanks to its rigidity: every phase has a defined result and process review

DISADVANTAGES

High risks and uncertainty

Iterative SDLC Model

The Iterative SDLC model does not need the full list of requirements before the project starts. The development process may start with the requirements to the functional part, which can be expanded later.  

ADVANTAGES                                        

Some functions can be quickly be developed at the beginning of the development lifecycle

DISADVANTAGES

Iterative model requires more resources than the waterfall model

The paralleled development can be applied Constant management is required

Spiral SDLC Model

Spiral model – is SDLC model, which combines architecture and prototyping by stages. It is a combination of the Iterative and Waterfall SDLC models with the significant accent on the risk analysis.

4 0
2 years ago
3. Of the following pieces of information in a document, for which would you most likely insert a mail merge field? A. First nam
yuradex [85]
I would suggest the answer would be both A and D, mail merge is used to specify different field for different recipients. 
4 0
2 years ago
Read 2 more answers
Other questions:
  • Which use case can be accomplished using a custom link? Choose 3 ans A. Navigate to a process to update the current record. B. N
    10·1 answer
  • Suppose you have a certain amount of money in a savings account that earns compound monthly interest, and you want to calculate
    10·2 answers
  • A network administrator has received the IPv6 prefix 2001:DB8::/48 for subnetting. Assuming the administrator does not subnet in
    11·1 answer
  • Write a code segment that uses an enhanced for loop to print all elements of words that end with "ing". As an example, if words
    6·1 answer
  • What data discovery process, whereby objects are categorized into predetermined groups, is used in text mining?
    9·1 answer
  • Your friend Margo is considering what type of display to purchase with her new desktop computer and she asks you for advice. You
    14·1 answer
  • A program is loaded into _________ while it is being processed on the computer and when the program is not running it is stored
    15·2 answers
  • In C++ the declaration of floating point variables starts with the type name double, followed by the name of the variable, and t
    10·1 answer
  • Which of these are characteristics of a Python data type? Check all that apply.
    11·1 answer
  • Anna bought a box of blueberries for £7. She used 700 grams for a cheesecake and she has 450 grams left. How much did the bluebe
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!