answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
kodGreya [7K]
2 years ago
12

A company manufactures 2,000 units of its flagship product in a day. The quality control department takes a random sample of 40

units to test for quality. The product is put through a wear-and-tear test to determine the number of days it could last. If the product has a lifespan of less than 26 days, it is considered defective. The table gives the sample data that a quality control manager collected.
What is the population mean and point estimate for the mean of this sample?

A.
There is insufficient data to calculate the population mean. The point estimate = 32.3.
B.
The population mean = 32.3. There is insufficient data to calculate the point estimate for the mean.
C.
There is insufficient data to calculate the population mean. The point estimate = 34.48.
D.
The population mean = 35.76. There is insufficient data to calculate the point estimate for the mean.
E.
The population mean = 36.04. There is insufficient data to calculate the point estimate for the mean.

Mathematics
2 answers:
Setler [38]2 years ago
6 0
Answe may be A hope helped
Vilka [71]2 years ago
4 0

Answer:

A

Step-by-step explanation:

You might be interested in
Lindsey bought a picnic basket originally priced at $40 but on sale for 50% off. After 10% sales tax, what was the total cost?
MaRussiya [10]

Answer:

$30

Step-by-step explanation:

Given data

Origianal price= $40

discount= 50%

Tax= 10%

Let us find the amount of the discount and tax

Discount

=50/100*40

=0.5*40

=$20

Tax

=10/100*40

=0.1*40

=$4

Hence the total cost is

=40-20+10

=$30

7 1
2 years ago
Read 2 more answers
The table shows how an elevator 500 feet above the ground is descending at a steady rate. Which equation represents the height,
Gennadij [26K]
This is the concept of algebra, given that the elevator is 500ft above the ground and it is descending at a steady rate of 5ft/sec. Then height h, at time t of the elevator movement can be modeled by the equation:
h(t)=-5t+500.
The correct answer is h(t)=-5t+500
5 0
2 years ago
Joe wants to enlarge the rectangular pumpkin patch located on his farm. The pumpkin patch is currently 40 meters wide and 60 met
den301095 [7]

Answer:

The area of new pumpkin patch is  Area_2  =  15 x² + 380 x + 2400

Step-by-step explanation:

Given as :

The length of rectangular patch = L = 40 meters

The width of rectangular patch = W = 60 meters

So, The area of rectangular patch = Length × Width

Or, Area_1 =  L × W

So ,  Area_1  =  40 meters × 60 meters

Or,  Area_1 =  2400 meters²

Again The Width of new Patch = ( 40 + 3 x ) meter

And     The Length of new Patch = ( 60 + 5 x )  meter

Or, Area_2  =  L × W

So ,Area_2  =  ( 40 + 3 x ) meters × ( 60 + 5 x ) meters

Or,  Area_2  = 2400 + 200 x + 180 x + 15 x²

Or,  Area_2  =  15 x² + 380 x + 2400

Hence The area of new pumpkin patch is  Area_2  =  15 x² + 380 x + 2400  Answer

8 0
2 years ago
Find the difference 18,354 4,672
attashe74 [19]

Answer:

18,354 - 4,672= 13,682

Step-by-step explanation:

I'm not sure what you meant but above is the answer of what I think you were asking.

6 0
2 years ago
A town has a population of 14,000 and grows 5% every year. What will be the population after 14 years, to the nearest whole numb
hammer [34]

Answer:

23,800 people

Step-by-step explanation:

what is 5 % of 14,000- 700( 0.05 times 14,000)

700 times 14 is 9,800

9800 + 14000 is

0 0
2 years ago
Other questions:
  • In this diagram, which equation could you prove to be true in order to conclude that the lines are parallel?
    14·2 answers
  • At Fairview middle school 75 band members need to raise a total for a trip of $8,250 for a trip so far they have raised $3,120 h
    7·1 answer
  • A ball is thrown down from a balcony with a vertical velocity (in ft/s) given by
    15·2 answers
  • A 5 hour conference booking is required for an office party for 120 people which includes a buffet dinner. Hotel 5 has recently
    10·1 answer
  • good job on increasing our team sales from 90 to 130 units per day.” wow i never thought that we could increase our sales by
    7·1 answer
  • The difference in the x- coordinates of two points is 3, and the difference in the y- coordinates of the two points is 6. What i
    7·2 answers
  • How much oil wells in a given field will ultimately produce is key information in deciding whether to drill more wells. Data was
    15·1 answer
  • Which function has an inverse that is also a function?
    12·2 answers
  • Argo wants to build a rectangular fence around her garden, and she has 242424 meters of wood. Which of these dimensions will giv
    11·2 answers
  • THE COST OF SALAD AT A RESTAURANT DEPENDS ON MANY FACTORS LIST AT LEAST TWO INDEPENDENT VARIABLES THAT COULD AFFECT THE COST OD
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!