Answer:
Step-by-step explanation:
The equation of a line can be easily found from the graph. First, find two points on the line that intersect points on the graph, then plot the changes in the two axis in this manner (change in y)/(change in x), or rise/run. Thus, the slope of this line is 5/3. Then, the b in y = mx + b is simply when the line intersects the y-axis, in this case -5. Thus, the equation of the line is
y = -5/3x - 5
Hope it helps <3
(If it does please mark brainliest ._. :) )
Answer: 2 years 1 month
Step-by-step explanation:
2 years 1 month at $100 a month = $2,500
$720 x 2 years = $1,440
$720 / 12 months = $60
$1,440 + $60 = $1,500
$4,000 - $1,500 = $2,500
Well, if we put everything together we have gone .25 of a mile in 72 seconds.
Since .25 is a quarter of a mile (1/4) we can estimate that in 288 seconds the car has traveled one mile. We got 288 by multiplying .25 by 4.
Answer: The margin of error = 3.71, confidence interval = (354.04, 361.46) and it means that mean cost is lies within the confidence interval.
Step-by-step explanation:
Since we have given that
Sample size = 400
Mean = $357.75
Standard deviation = $37.89
At 95% confidence level, z = 1.96
We first find the margin of error.
Margin of error is given by

95% confidence interval would be

Hence, the margin of error = 3.71, confidence interval = (354.04, 361.46) and it means that mean cost is lies within the confidence interval.