answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
morpeh [17]
2 years ago
6

Show that if the contribution to profit for trains is between $1.50 and $3, the current basis remains optimal. If the contributi

on to profit for trains is $2.50, then what would be the new optimal solution?

Business
1 answer:
Dmitriy789 [7]2 years ago
5 0

Answer:

210

Explanation:

Let us consider that x is the number of soldiers produced each week and y is number of trains produced each week.

Also, weekly revenues and costs can be expressed in terms of the decision variables x and y.

Then,

Hence the profit which we want to maximize is given by,

Now the constraints are given as,

Finishing Constraint:

Each week, no more than 100 hours of finishing time may be used.

Carpentry Constraint:

Each week, no more than 80 hours of carpentry time may be used.

Demand Constraint:

Because of limited demand, at most 40 soldiers should be produced each week.

Combining the sign restrictions and with the objective function  and constraints,and yield the following optimization model:

Such that,

First convert the given inequalities into equalities:

From equation (1):

If x=0 in equation (1) then (0,100)

If y=0 in equation (1) then (50,0)

From equation (2):

If x=0 in equation (2) then (0,80)

If y=0 in equation (2) then (80,0)

From equation (3):

Equation (3) is the line passing through the point x=40.

Therefore, the given LPP has a feasible solution first image

The optimum solution for the given LPP is obtained as follows in the second image

The optimal solution to this problem is,

And the optimum values are  .

Let c be the contribution to profit by each train. We need to find the values of c for which the current, basis remain optimal. Currently c is 2, and each iso-profit line has the form

3x +  2y = constant

y = 3x/2 +constant/ 2

And so, each iso-profit line has a slope of  .

From the graph we can see that if a change in c causes the isoprofit lines to be flatter than the carpentry constraint, then the optimal solution will change from the current optimal solution to a new optimal solution, If the profit for each train is c, the slope of each isoprofit line will be.

-3/c

Because the slope of the carpentry constraint is –1, the isoprofit lines will be flatter than the carpentry constraint.

If,

-3/c<-1

c >3

and the current basis will no longer be optimal. The new optimal solution will be point A of the graph.

If the is oprofit lines are steeper than the finishing constraint, then the optimal solution will change from point B to point C. The slope of the finishing constraint is –2.

If,

-3/c < -2 or

C < 1.5

Then the current basis is no longer optimal and point C,(40,20), will be optimal. Hence when the contribution to the profit for trains is between $1.50 and $3, the current basis remains optimal.

Again, consider the contribution to the profit for trains is $2.50, then the decision variables remain the same since the contribution to the profit for trains is between $1.50 and $3. And the optimal solution is given by,

z = 3× (20) + 2.5 × (60)

= 60 + 150

= 210

You might be interested in
Kim is on a crew that sets up the equipment for a very popular musician. Before the concerts, she sets up lights, microphones, s
andrew11 [14]

Answer:

✔ Audio and Video Equipment Technician

✔ Broadcast Technician

✔ Film and Video Editor

✔ Sound Engineering Technician

Explanation:

5 0
2 years ago
Read 2 more answers
Clayborn Company deposits all cash receipts on the day they are received and makes all cash payments by check. At the close of b
Aleks04 [339]

Answer:

$27,900

Explanation:

The computation of adjusted cash balance is shown below:-

Adjusted cash balance = Balance at May 31 - bank service fees - NSF check

= $28,525 - $25 - $600

= $27,900

Therefore for computing the adjusted cash balance we simply deduct the bank service fee and NSF check from balance at may 31

Hence, the adjusted cash balance is $27,900

7 0
2 years ago
The variety of Riverside Ranger logo T-shirts includes 12 different designs. Setup between designs takes one hour (and $18,000),
cluponka [151]

Answer:

The production exhibit both scope economics and scale economics. They are not mutually exclusive.

Explanation:

Looking at the scenario critically, we will clearly see the tendency of a scope economics. Scope economics basically hinges on getting a competitive advantage, essentially because of producing in large quantities and numbers. Riverside Ranger logo T-shirts exhibits this as it produce its products in large numbers, producing 1000 pieces of a particular design in 1 hour.

In same breath, we also have the scale economics exhibited by the organization. Taking a deeper look at the cost representation, we will see that the average cost tend to reduce as the production increases. Thus, an economic of scale is achieved here by leveraging on the mass and swift production style of Riverside Rangers logo T-shirts.

7 0
2 years ago
Suppose that students at Big University buy season football tickets at the beginning of the fall semester. Everyone expects that
Elena L [17]

Answer:

A) The current supply will shift to the left

Explanation:

The supply curve shifts to the left when the total quantity supplied decreases, which results in a price increase at any given quantity.

If everyone expects that the football team will have a great season, the quantity demanded for tickets will increase, which will increase their price. But the suppliers will also hold to their tickets until a day or two before the games to increase expectations and fans' anxieties. That way the price will increase even more, and they will make a higher profit.

8 0
2 years ago
On January 1, Year 1, Stratton Company borrowed $100,000 on a 10-year, 7% installment note payable. The terms of the note requir
hammer [34]

Answer:

Dr interest expense $7,000

Dr notes payable $7,238

Cr cash                                     $14,238    

Explanation:

The first task is to compute interest expense on the loan in year 1 which is shown below:

interest expense=$100,000*7%

interest expense=$7,000

Principal repayment=repayment-interest repayment

Principal repayment=$14,238-$7,000=$7,238

The double entries are to debit interest expense and notes payable with $7,000 and $7,238 respectively while cash is credited with $14,238 as an outflow of cash.

3 0
2 years ago
Other questions:
  • One perk most drinking establishments offer to designated drivers is free __________ .
    12·2 answers
  • Suppose an ocean-front hotel rents rooms. In the winter, demand is: P_1 = 80 - 2Q_1 with marginal revenue of: MR_1 = 80-4Q_1. Ho
    5·1 answer
  • Consider the following three decisions that an organization could be faced with:
    12·1 answer
  • Suppose that a chicken farm uses a nearby stream to dispose of the wastes released by its chickens. These wastes flow downstream
    7·1 answer
  • Brewsky's is a chain of micro-breweries. Managers are interested in the costs of the stores and believe that the costs can be ex
    11·1 answer
  • XYZ borrowed $50,000 this year. Half of the loan will be repaid next year and the remainder will be paid the following year. How
    10·2 answers
  • Games Galore Corp. hires Haley, a minor, to create new customized game software for certain clients. Haley signs a contract that
    8·1 answer
  • 01:42:59 Scott really enjoys working with money, including making it grow. He is also a natural leader and would enjoy working w
    11·2 answers
  • easure of Damages. Before buying a house, Dean and Donna Testa hired Ground Systems, Inc. (GSI), to inspect the sewage and water
    10·1 answer
  • On average, it takes one packaging and shipping employee 15 minutes to prepare a package and label, independent of the number or
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!