answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
natali 33 [55]
1 year ago
14

An increase in walking has been shown to contribute to a healthier life-style. A sedentary American takes an average of 5000 ste

ps per day (and 65% of Americans are overweight). A group of health-conscious employees of a large health care system volunteered to wear pedometers for a month to record their steps. It was found that a random sample of 40 walkers took an average of 5430 steps per day, and the population standard deviation is 600 steps. At = 0.05 can it be concluded that they walked more than the mean number of 5000 steps per day?
Mathematics
1 answer:
Zielflug [23.3K]1 year ago
6 0

Answer:

Step-by-step explanation:

We would set up the hypothesis test. This is a test of a single population mean since we are dealing with mean

For the null hypothesis,

H0: µ = 5000

For the alternative hypothesis,

H1: µ > 5000

Since the population standard deviation is given, z score would be determined from the normal distribution table. The formula is

z = (x - µ)/(σ/√n)

Where

x = sample mean

µ = population mean

σ = population standard deviation

n = number of samples

From the information given,

µ = 5000

x = 5430

σ = 600

n = 40

z = (5430 - 5000)/(600/√40) = 4.53

Looking at the normal distribution table, the probability corresponding to the z score is < 0.0001

Since alpha, 0.05 > than the p value, then we would reject the null hypothesis. Therefore, at a 5% level of significance, it can be concluded that they walked more than the mean number of 5000 steps per day.

You might be interested in
An algebra tile configuration. Only the Product spot is shown. 8 tiles are in the Product spot in 3 columns with 3 rows. First r
tamaranim1 [39]

Answer:

i think its a

Step-by-step explanation:

5 0
2 years ago
Read 2 more answers
Which is an x-intercept of the continuous function in the table?
Ad libitum [116K]

Answer:

B. (3, 0)

Step-by-step explanation:

The x-intercept is the point where the graph of the function meets the x-axis.

At x-intercept, y=0 or f(x)=0

So look through the table and find where f(x)=0.

From the table, f(x)=0 at x=3.

We write this as an ordered pair.

Therefore the x-intercept is (3,0)

The correct choice is B.

7 0
2 years ago
Read 2 more answers
A basket of 40 pairs of pliers at a discount hardware store includes 5 pairs of 6-inch pliers. A second basket contains 20 hamme
Kryger [21]
First, add all the numbers together, which is 68. Then divided 100 by 68, which gives you the number 1.47, and that's your answer.
4 0
2 years ago
Read 2 more answers
A circular backyard pool has a diameter of 26 feet and is 4 feet deep. One cubic foot of water has a capacity of approximately 7
klasskru [66]
Find the water volume of the pool.  The formula for a vertical cylinder is V = pi*r^2*h, which here is V = pi(13 ft)^2*(4 ft) = 676*pi cubic feet.

Now convert this 676 cu. ft. to gallons:

Mult (676*pi cu ft) by the conversion factor (7.48 gal) / (1 cu ft):

676*pi cu ft     7.48 gal
--------------- * ------------- = 5056*pi gallons (rounded down from 5056.48 pi)
        1             1 cu ft

The cost of filling the pool will be

5056.48*pi gallons        $3
--------------------------- * ------------- = $48 (to the nearest dollar)
        1                           1000 gal
7 0
2 years ago
There are four activities on the critical path, and they have standard deviations of 1, 2, 4, and 2. what is the probability tha
Anit [1.1K]

Standard deviations of the four activities of the critical path are 1,2,4,2.

Standard deviation of this critical path = Sum of square root of variance of this corresponding critical path

Standard deviation of critical path =\sqrt{1^2+2^2+4^2+2^2}

=\sqrt{1+4+16+4}

=\sqrt{25}

=5

Now we need to find the probability that the project will completed in 38 weeks given that its expected completion time is 40 weeks.

That is, we need to find P(X<38) :

z=\frac{38-40}{5}= \frac{-2}{5}=-0.4

P(X

Probability =0.5-0.16=0.34

Thus the probability that the project will be completed in 38 weeks is 0.34.

8 0
2 years ago
Read 2 more answers
Other questions:
  • cho used 2 1/3 cups of flour to bake a cake. she used 3 1/4 cups of flour to bake a loaf of bread. how much more flour did cho u
    13·2 answers
  • Complete the table of values
    9·1 answer
  • Ahmad just put some money into a cd that pays 11.3% interest compounded semiannually according to the rule of 72 in approximatel
    10·1 answer
  • A tourist drives 70 miles along a scenic highway and then takes a 7-mile walk along a hiking trail. The average velocity driving
    13·1 answer
  • What is the value of x
    11·2 answers
  • A magazine presented a lesson in hypothesis testing carried out by medical students in a biostatistics class. Students were​ bli
    6·1 answer
  • A sphere of radius 7 in. Is placed inside a rectangular prism with length 15 in., width 18 in., and height 20 in. What is the vo
    8·1 answer
  • WILL GIVE BRAINLIEST. Joanna saves nickels and quarters in a jar. If she saved five times as many nickels as quarters, and her c
    15·1 answer
  • You supervise a team of seven workers. You record the number of team members who reach
    12·1 answer
  • 19,432÷x=48 Remainder 232 (Plz help its for my hw that's due tmrw)
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!