
8 out of 300 were defective.
80 pairs were defective
Part 1:
Given a number line with the point

and the point

The sampling error is given by:

Part 2:
Given a number line with the point

and the point

The sampling error is given by:
Answer:
Hey there!
The robot moves 63 cm in 9 seconds. Then in 1 second, it moves 7 cm.
If it goes 49 cm, it will take 7 seconds.
Let me know if this helps :)