answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
kow [346]
2 years ago
9

A contractor has submitted bids on three state jobs: an office building, a theater, and a parking garage. State rules do not all

ow a contractor to be offered more than one of these jobs. If this contractor is awarded any of these jobs, the profits earned from these contracts are: million from the office building, million from the theater, and million from the parking garage. His profit is zero if he gets no contract. The contractor estimates that the probabilities of getting the office building contract, the theater contract, the parking garage contract, or nothing are , , , and , respectively. Let be the random variable that represents the contractor's profits in millions of dollars. Write the probability distribution of . Find the mean and standard deviation of . Round your answers to three decimal places, if required.

Mathematics
1 answer:
german2 years ago
6 0

Answer:

The following are the answer to this question:

Step-by-step explanation:

In the given question the numeric value is missing which is defined in the attached file please fine it.  

Calculating the probability of the distribution for x:

\to f(x) = 0.19\  for \ x=14\\\\\to  f(x) = 0.29 \ for\ x=7\\\\\to f(x) = 0.38\  for \ x=1\\\\\to f(x)=0.14 \ for \ x=0\\

The formula for calculating the mean value:

\bold{ E(X)= x \times f(x)}

          =14 \times 0.19+7 \times 0.29+1 \times 0.38+0\times 0.14\\\\=2.66 + 2.03+0.38+ 0\\\\=5.07

\bold{E(X^2) = x^2 \times f(x)}

           =14^2 \times 0.19+7^2 \times 0.29+1^2 \times 0.38+0^2 \times 0.14 \\\\=196 \times 0.19+ 49 \times 0.29+1 \times 0.38+0 \times 0.14\\\\= 37.24+ 14.21+ 0.38+0 \\\\=51.83

use formula for calculating the Variance:

\to \bold{\text{Variance}= E(X^2) -[E(X)]^2}

                  = 51.83 - (5.07)^2\\\\= 51.83 -  25.70\\\\=26.13

calculating the value of standard deivation:

Standard Deivation (SD) = \sqrt{Variance}

                                          = \sqrt{26.13} \\\\=5.111

You might be interested in
The yearbook staff enlarges a picture with a length of 5 inches and a width of 7
lapo4ka [179]
I believe yes, the area of the picture is 78.75 square inches. hope this helps you
5 0
1 year ago
Read 2 more answers
What effect will a translation 3 units down and 2 units left have on the polygon? Be sure to address how it could impact the ang
Tanzania [10]
For the answer to the question above, when you carry your jewelry box or your phone 3 floors down 
and 2 miles to the left, the angles and side lengths don't change, 
and it still looks exactly the same as it did before you picked it up 
and moved it.

Translation can't change angles or lengths.  And if those don't 
change, then the later shape is congruent to the earlier shape.
8 0
1 year ago
Read 2 more answers
The team mascot shoots a rolled T-shirt from a special T-shirt cannon to a section of people in the stands at a basketball game.
san4es73 [151]
A.f(t) = –16(t – 1)2<span> + 24</span>
3 0
2 years ago
Read 2 more answers
Which of the following steps were applied to ABCD to obtain A’B’C’D’?
devlian [24]

Answer:

c- shifted 3 units right and 4 units up

Step-by-step explanation:

In this problem, we have a quadrilateral named as ABCD. Recall that a quadrilateral is a two-dimensional shape having four sides. So, we need to identify what transformation has been performed to get A'B'C'D', which is the same quadrilateral shifted certain units right and up. So take one point, say, B, so how do we need to do to obtain point B'? well, we need to move that point 3 units right and 4 units up, but how can we know this? just count the number of squares you need to move from B to B' horizontally and vertically, which is in fact  3 units right and 4 units up.

6 0
1 year ago
Read 2 more answers
At noon (12:00), Annette rented a bicycle to travel around Stanley Park. She returned the bicycle at 4:00 pm (16:00) the same da
Doss [256]

Answer:

a. average speed is 12km/hr

b. $5.50 dollars per hour

c. $0.46 per km

Step-by-step explanation:

a. 48km/4hrs = 12km/hr

b. $22/4hrs = $5.50/hr

c. $22/48km = $0.45833/km rounded to $0.46/km

6 0
2 years ago
Other questions:
  • What addition doubles fact can help you find 4+3? Explain how you know?
    7·1 answer
  • The perimeter of a rectangle is 80x. The base is two times the height. In terms of x, what are the dimensions of the rectangle?
    12·2 answers
  • Solve the triangle. A = 19°, C = 102°, c = 6
    12·1 answer
  • Consider the polynomial equation x(x-3)(x+6)(x-7)=0
    13·1 answer
  • A homeowner has an octagonal gazebo inside a circular area. Each vertex of the gazebo lies on the circumference of the circular
    13·3 answers
  • Angelique had 20 tokens to use for games at the arcade. She lost some of them. Her dad tripled the tokens she had left. Angeliqu
    11·2 answers
  • If x and y satisfy both 9x+2y=8 and 7x+2y=4, then y=?
    9·1 answer
  • Calculating Profit Using this table, calculate the profit at each level of bicycle production. One bike: -$ Two bikes: $ Three b
    9·1 answer
  • The Post Office has established a record in a major midwestern city for delivering 90 percent of its local mail the next working
    11·1 answer
  • miguel is buying prizes for a raffle.he will buy one prize that costs 50$ and four prizes that cost 20$ for each . The remainder
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!