Answer:
see explaination
Step-by-step explanation:
Here the null hypothesis is that the PCB survives against the alternate that the PCB 'does not survive'. The test says that the PCB will survice if it is classified as 'good'; or, it will not survive if it is classifies as 'bad'.
a. The Type II error is the error committed when a PCB which cannot actually survive is classified as 'good'.
b. Therefore P(Type II error) = P(The PCB is classified as 'good' | PCB does not survives) = 0.03.
Answer:
All the expressions other than option E, is equivalent to the expression 18m - 12.
Step-by-step explanation:
A. 6m - 4 + 6m -4 + 6m - 4
or 6m+6m+6m -4 -4 -4
or 18m -12
B. 12m + 6 - 6m -6
or 12m - 6m + 6 - 6
or 6m
C.6(3m - 2)
or 18m - 12
D.3(6m - 4)
or 18m - 12
E. 24n - 4² + 8 -6m
This option can not satisfy the given expression as it contains another variable as n.
Answer:
The principal amount was $23,393.45
Step-by-step explanation:
The total amount paid on a 35 year loan was $98,000 at the rate of interest 4.1%
We will calculate Principal amount by this formula

Where A = amount (98,000)
P = Principal amount (P)
r = rate of interest 4.1% (0.041)
n = number of compounding interest monthly (12)
t = time (35 years)



98,000 = P(4.189386)
= 4.189386P = 98,000
P = 
P = 23,392.4494 ≈ $23,392.45
The principal amount was $23,393.45
Answer:
I believe "The height of each pyramid is one-half h units"