Stanford Corporation has four categories of overhead. The expected overhead costs for each category for next year are as follows

:
Maintenance $210,000
Materials handling 90,000
Setups 75,000
Inspection 150,000

The company has been asked to submit a bid for a proposed job. The plant manager believes that obtaining this job would result in new business in future years. Bids are usually based upon full manufacturing cost plus 30 percent. Estimates for the proposed job are as follows:

Direct materials $5000
Direct labor (375 hours) $7500
Number of material moves 4
Number of inspections 3
Number of setups 2
Number of machine-hours 150

Expected activity for the four activity-based cost drivers that would be used is:

Machine-hours 10,000
Material moves 2,000
Setups 100
Quality inspections 4,000


Required:
a. Determine the amount of overhead that would be allocated to the proposed job if 20,000 direct labor-hours are used as the volume-based cost driver.
b. Determine the total costs of the proposed job.
c. Determine the company's bid if the bid is based upon full manufacturing cost plus 30 percent.
d. Determine the amount of overhead that would be applied to the proposed project if activity-based costing is used.
Business
1 answer:
aliina [53]1 year ago
8 0

Answer:

Results are below.

Explanation:

a)

<u>First, we need to calculate the predetermined overhead rate:</u>

<u></u>

Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base

Predetermined manufacturing overhead rate= 2,325,000 / 20,000

Predetermined manufacturing overhead rate= $116.25 per direct labor hour

<u>Now, we can allocate overhead:</u>

Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base

Allocated MOH=  116.25*375

Allocated MOH= $43,493.75

<u>b)</u>

Total cost= 5,000 + 7,500 + 43,493.75

Total cost= $55,993.75

<u>c)</u>

Selling price= 55,993.75*1.3

Selling price= $72,791.88

<u>d)</u>

<u>First, we need to calculate the activities rate:</u>

<u></u>

Maintenance= 210,000 / 10,000= $21 per machine hour

Materials handling= 90,000 / 2,000= $45 per material move

Setups= 75,000 / 100= $750 per setup

Inspection= 150,000 / 4,000= $37.5 per inspection

Now, we can allocate overhead:

Maintenance= 21*150= 3,150

Materials handling= 45*4= 180

Setups= 750*2= 1,500

Inspection= 37.5*3= 112.5

Total allocated costs= $4,942.5

You might be interested in
Willow Springs produces various wooden bookcases, tables, storage units, and chairs. Which of the following would be included in
DENIUS [597]

Answer: The correct answer is "e. Transfer of chairs from the assembly line to the staining facility and storage of completed bookcases in inventory. ".

Explanation: The statement "e. Transfer of chairs from the assembly line to the staining facility and storage of completed bookcases in inventory. " would be included in a listing of the company's non-value-added activities.

An activity is everything that consumes resources. The resources consumed can be tangible (materials, time, money) and intangibles (mood, effort, illusion).

Value is what someone appreciates. In economic activities we refer to value as "what someone is willing to pay" for your product. That someone would be the customer. If the Client does not pay it, it is because he does not appreciate it, it does not give it value.

<u>In this case, the activities that do not clearly generate value are "transfer" and "storage". Although there are activities that do not generate value but are necessary such as transfer, storage could be eliminated or optimized so that it is not an activity that limits production or increases costs.</u>

6 0
2 years ago
Despite tuition skyrocketing, a college education is still valuable. Recent calculations by the Federal Reserve Bank in San Fran
gladu [14]

Answer:

s = $13,014.22

Explanation:

Sample values: $40,632, $35,554, $42,192, $33,432, $69,479 and $43,589

Sample size = 6

The standard deviation of a sample (s) is given by:

s=\sqrt{\frac{\sum(x_i-X)^2}{n-1}}

Where X is the sample mean, n is the sample size, and xi is each value in the sample.

The sample mean is given by:

X=\frac{\$40,632 +\$35,554+\$42,192 +\$33,432 +\$69,479 +\$43,589}{6} \\X=\$44,146.33

The standard deviation is:

s=\sqrt{\frac{\sum(x_i-\$44,146.33)^2}{6-1}}\\s=\$13,014.22

5 0
2 years ago
Gerald is very good with customers, is friendly, and works well with a team. Which career is Gerald most likely a part of? Nucle
iogann1982 [59]

Answer:

Gas Pumping Stattion

Explanation:

I think this is the answer.....

Hope this helps lmo

3 0
2 years ago
Read 2 more answers
The Bureau of Labor Statistics reported the CPI stood at 215.9 in December 2009, while one year earlier it was 210.2. Suppose Ja
makvit [3.9K]

Answer:

Annual rate of inflation = [(215.9 - 210.2) / 210.2] * 100

Annual rate of inflation = 2.7%

Real income change = Nominal income change - inflation rate

Janice Real income change = 4% – 2.7%

Janice Real income change = 1.3%

This means Janice's real income did increase by 1.3%.

Jeff Real income change = 2% – 2.7%

Jeff Real income change = -0.7%

This means Jeff's real income did decrease by 0.7%.

7 0
1 year ago
Midyear on July 31st, the Digby Corporation's balance sheet reported: Total Liabilities of $77.152 million Cash of $6.030 millio
jonny [76]

Answer:

$45.027 million

Explanation:

The accounting equation shows the relationship between the various elements of the balance sheet. These are the assets, liabilities and equity. It is given as

Assets = Liabilities + Equity

The owner's equity is made up of the common stock and retained earnings (which is the net income less dividend paid over the period).

Equity = $125.989 million - $77.152 million

= $48.837  million

Retained earnings = Equity - Common stock

= $48.837  million - $3.810 million

= $45.027 million

Digby Corporation's retained earnings is $45.027 million

5 0
1 year ago
Other questions:
  • You look up the phone number of the new pizza hut and repeat the number silently in your head until you find a pad of paper to w
    9·1 answer
  • Which of the following statements are true? A) Sensitivity analysis is a process of seeing how optimal decision and EMV vary whe
    11·1 answer
  • Suppose the market for tortillas is initially in equilibrium, but then the equilibrium wage rate and the equilibrium quantity of
    10·1 answer
  • Of the following, identify the CORRECT statement. a. A bond's current yield must always be either equal to its yield to maturity
    11·1 answer
  • The following information is taken from the records of Erie Corp.(in thousands) for the year ended on December 31: 2019 2018 Sal
    9·1 answer
  • Sales returns and allowances A) Represent a reduction of the customer's account receivable B) Provide information about dissatis
    11·1 answer
  • Marianne has opened a jewelry shop in your community and sources precious gems and metals only from Canada rather than Africa. H
    11·1 answer
  • Suppose a year ago the exchange rate between Mexican pesos and dollars was 13.5 pesos per dollar, and that according to relative
    11·1 answer
  • The Hawkins Supply company is currently faced with an inventory rotation problem. This difficulty stems from the fact that some
    6·1 answer
  • Mr. Josh Kenney, a U.S. citizen and resident of Vermont, owns 100 percent of the stock of JK Services, which is incorporated und
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!