Answer:
8
Step-by-step explanation:
Since the forklift has a maximum capacity of three boxes per trip, simply divide the total number of boxes (23 boxes) by three and round up to the nearest whole unit to find the number of trips required:

Casey had to visit the dock 8 times. He moved three boxes in seven trips and two boxes in one trip.
The vertex (5,39)
5 is the value of x. 39 is the value of y. y is the cost function of the minimum value in dollars.
(5,39) vertex means that <span>Buying five of each type of plant costs $39, which is the lowest possible cost.</span>
Answer:
For this case we have the following info related to the time to prepare a return

And we select a sample size =49>30 and we are interested in determine the standard deviation for the sample mean. From the central limit theorem we know that the distribution for the sample mean
is given by:
And the standard deviation would be:

And the best answer would be
b. 2 minutes
Step-by-step explanation:
Previous concepts
Normal distribution, is a "probability distribution that is symmetric about the mean, showing that data near the mean are more frequent in occurrence than data far from the mean".
The central limit theorem states that "if we have a population with mean μ and standard deviation σ and take sufficiently large random samples from the population with replacement, then the distribution of the sample means will be approximately normally distributed. This will hold true regardless of whether the source population is normal or skewed, provided the sample size is sufficiently large".
Solution to the problem
For this case we have the following info related to the time to prepare a return

And we select a sample size =49>30 and we are interested in determine the standard deviation for the sample mean. From the central limit theorem we know that the distribution for the sample mean
is given by:
And the standard deviation would be:

And the best answer would be
b. 2 minutes
Answer:
30 hours
Step-by-step explanation:
so i did 396.10/ 17, and i got 23.3 then u divide his hourly pay by 699.00 and u got 30
Ok so 1.5 is pins and 6.5 is t shirts so you multiply 1.5 x 20 and 6.5 x 5 so for pins= $30 and T-shirts= $32.50 and you times both those numbers by 3 so for pins you get $90 and T-shirts you get $97.50. Finally you add them and get $187.5 so the answer is $187.5 for the project.