4. 19.8
56/4=14
Diagonal of a square is equal to one side multiplied by the square root of two.
Therefore, it is 19.8, being that square root is (in super simple rounding) 1.5.
Answer:
Part A)
x+y=80
y=x+20
B)
30 minutes
C)
no
If Pam was to spend 60 minutes practicing dance, then she would only get 20 minutes of math. 60-20=40. She would be practicing dance 40 minutes more than math, not just 20.
Answer:
The answer is 3
Step-by-step explanation:
B/c 8+2=10 just add one more and 2+1=3
Answer:
the probability that the project will be completed in 95 days or less, P(x ≤ 95) = 0.023
Step-by-step explanation:
This is a normal probability distribution question.
We'll need to standardize the 95 days to solve this.
The standardized score is the value minus the mean then divided by the standard deviation.
z = (x - xbar)/σ
x = 95 days
xbar = mean = 105 days
σ = standard deviation = √(variance) = √25 = 5
z = (95 - 105)/5 = - 2
To determine the probability that the project will be completed in 95 days or less, P(x ≤ 95) = P(z ≤ (-2))
We'll use data from the normal probability table for these probabilities
P(x ≤ 95) = P(z ≤ (-2)) = 0.02275 = 0.023
Answer:
B
Step-by-step explanation:
The average of paid time off is the sum of the paid time off (T) of each employee divided by the number of employees(n):
av = (∑T)/n
Thus, av is directly proportional to the sum of T and indirectly proportional to n. It means that if T raises, the average raises too. So, the manager must fire the employees who have the least number of days off, so T will increase.