Job v starts at time 0 and completes at time 3.
Job w starts at time 1 and completes at time 4.
Job x starts at time 4 and completes at time 8.
Job y starts at time 8 and completes at time 10.
Job z starts at time 10 and completes at time 15.
The average completion time is (3 +4 +8 +10 +15)/5 = 8 . . . hours.
_____
<em>Comment on the schedule</em>
Jobs v and x are the only ones completed by the time due. The latest is 8 hours late. If they are scheduled in order of due time, jobs v, w, and y can be completed by the due time; the others will be 4 and 6 hours late.
Answer:

Step-by-step explanation:
The equation of line in the form .
y = mx + c
Where m is the slope and c is the y- intercept .
As given
The lines y=3x-1 and y=ax+2 are perpendicular .
Here 3 is slope for equation of line y=3x-1 and a is slope for equation of line
y=ax+2 .
Now by using properties of the perpendicular lines property .
When two lines are perpendicular than slope of one line is negative reciprocal of the other line .
Thus

Therefore 
Answer: The answer is A 17in2
Step-by-step explanation:
In the question it states that the triangles are congruent (both the same).
first I found the area of the top orange triangle.
the formula to find the area of a triangle is
(base times Height).
so I did
which gave me 8.27.
Since the triangles are congruent (the same) they would both have the same area along with base and height. so I multiplied 8.27 by 2 (because there are two triangles) and got 16.54 which rounds up to 17.
the question also stated to find the APPROXIMATE area (close to the actual, but not completely accurate or exact.)
Volume of cube=side³
ok, so you need to know the difference or sum of cubes
a³+b³=(a+b)(x²-xy+y²)
so
(4p)³+(2q²)³=
(4p+2q²)((4p)²-(4p)(2q²)+(2q²)²)=
(4p+2q²)(16p²-8pq²+4q⁴)
3rd option