Standard deviations of the four activities of the critical path are 1,2,4,2.
Standard deviation of this critical path = Sum of square root of variance of this corresponding critical path
Standard deviation of critical path 



Now we need to find the probability that the project will completed in 38 weeks given that its expected completion time is 40 weeks.
That is, we need to find P(X<38) :


Probability 
Thus the probability that the project will be completed in 38 weeks is 0.34.
He would need to sample at least every 100th name to get a best graph.
Answer:
A
Step-by-step explanation:
10-6 X 10-1 = 10-7
5.7*46.2=263.34
263.34=2.6334 x 10^2
10^2 x 10^-7 = 10^-5
so
=2.6334 x 10-5
Volume of cylinder A = π(12^2/4) x (40/2) = 2,262 cubic feet which will be hauled by locomotive BR73.
Volume of cylinder B = π(8^2/4) x 24 = 1,206 cubic feet which will be hauled by locomotive CG35.
Volume of cylinder C = π(16^2/4) x 16 = 3,217 cubic feet which will be hauled by locomotive YH61.
Volume of cylinder D = π(6^2/4) x 12 = 339 cubic feet which will be hauled by locomotive A450.
Answer:
144 gold bars
Step-by-step explanation:
first you fine the area gold bars take up in cubic inches by multiplying the 3, 2, and 6 to get 36
once you have the space 1 gold bar takes up you divide the total space by that the total space is 5184 so you divide 5184 by 36 to get 144